The planning ministry and the International Organization for Migration presented a study of how population patterns intersect with services, development and economic opportunity across Iraq.
French industrial group Mersen says it will supply GE Vernova with current-transmission systems for synchronous condensers to be deployed on Saudi Energy’s grid. The equipment is planned for several solar and wind projects.
Three artisanal mining areas were identified and allocated to operators in Lubudi territory, Lualaba province, Democratic Republic of the Congo. The report gave no mineral, acreage or output details.
Source: Agence Congolaise de Presse / Lualaba provincial administration
The planned JOD 5.2 million projects cover food manufacturing, fluorine products and agricultural pesticides, and nitrogen fertilizers; completed investment or jobs were not reported.
Source: Jordan News Agency Petra, citing Ministry of Investment
NOVATEK and three research partners opened a greenhouse-gas station to study permafrost and tundra ecosystems in the Yamal-Nenets region. The announcement reports no measured emissions or carbon-removal result.
A World Bank and IFC country private-sector diagnostic identified wood processing, Pointe-Noire–Brazzaville logistics, maize value chains and aquaculture as potential areas for diversification.
Source: Agence Congolaise d’Information / World Bank Group and IFC CPSD
Petroleum Minister Karim Badawi said Egypt is targeting an additional 250 million cubic feet a day of natural gas from the Zohr and West Mina fields by year-end. This is a target, not a reported production increase.
Source: Egypt State Information Service / Egyptian Natural Gas Holding Company
A Scottish Government planning direction requires an Environmental Impact Assessment with applications for new data centres above the 50-megawatt power threshold.
The company’s new Abdali branch is due to begin operations this month, according to the Ministry of Digital Economy; the announcement describes an engineering center, not a fabrication plant.
Source: Jordan News Agency Petra, reporting Ministry of Digital Economy statement
Google Analytics can measure visits and site activity using cookies if you allow it. You can change your choice later.
Measurement and privacy details
Google Analytics measurement starts only if you allow it. After consent, automatic measurement may cover scrolls, outbound link clicks, downloads, video engagement, site searches and basic form interactions; search terms may be detected from URL parameters. This site’s own code does not send form field values; email redaction in automatic measurement is best-effort, not guaranteed. Our manual page-view event uses a cleaned URL. You can change your choice later. Visits that begin with consent may also send numeric LCP, INP and CLS performance measurements after Analytics loads. A first or later grant starts this on the next page load; withdrawing consent stops these performance reports for this page. The preference cookie lasts six months; advertising measurement and personalization stay off.
Your browser is sending a Global Privacy Control signal. Analytics is off by default; you may explicitly change this choice here.