Our standards
HABER PAPER / NEWSROOM

Search: Elektrik — Page 11

419 stories

Browse topics

Elektrik: 419 results · Clear search

3 min readWith data

EconomyEvent / data period:

Azerbaijan non-oil-and-gas GDP grew 2.6% in January–September

Official data show total GDP rose 1.5% in real terms while oil-and-gas value added fell 1.2%, with growth varying across non-oil sectors.

Source: The State Statistical Committee of the Republic of Azerbaijan
2 min readWith data

EconomyEvent / data period:

World Bank estimates Republic of Congo extreme poverty at 51.2% in 2026

The World Bank’s October 2026 country brief estimates poverty at the $3-a-day 2021-PPP line at 51.2% in 2026, compared with 51.7% in 2021. The figure is an estimate, not a newly released household-survey result.

Source: World Bank
3 min readWith data

EconomyEvent / data period:

World Bank estimates Nigeria’s poverty rate at 63% in 2026

The World Bank’s 8 October Poverty and Equity Brief says Nigeria’s national poverty rate rose from 40.1% in 2019 to 56.2% in 2023 and is estimated at 63% for 2026. The latest figure is a forward estimate, not a new household survey.

Source: World Bank
2 min readWith data

EnergyEvent / data period:

Saudi Arabia and UAE plan feasibility studies for rail and electricity links

Saudi Arabia and the UAE signed a memorandum providing for technical and economic studies on rail connectivity, electricity interconnection and power exchange. Environmental feasibility is also included for electricity links; the agreement announces no construction decision, financing or delivery timetable.

Source: Emirates News Agency (WAM)
2 min readWith data

AgricultureEvent / data period:

Sudan agriculture minister cites a 31 million-feddan summer-season target

The 8 October briefing separates roughly 5.8 million tonnes of output in the previous season from current-season area estimates and reported farm financing.

Source: Sudan News Agency (SUNA), reporting the Minister of Agriculture and Irrigation
2 min readWith data

EnergyEvent / data period:

Equinor revises Snøhvit Future cost estimate to NOK 26.5 billion

Equinor reported a revised NOK 26.5 billion cost estimate for Snøhvit Future in 2026 value on 7 October. Its schedule remains unchanged, with onshore compression planned for 2029 and electrification for 2030.

Source: Equinor — Updated cost estimate for the Snøhvit Future project
HABER PAPER

Five editions. One wider view.

A multilingual perspective on the global economy.