EnergySource review period:
Yuksel Guler: energy security, grid resilience and rising demand
In a Wellficent interview, ENPRODE CEO Yuksel Guler discussed geopolitics, energy infrastructure and electricity demand.
هذه الصفحة متاحة أيضًا باللغة العربية.
التبديل إلى العربيةEsta página también está disponible en español.
Cambiar a españolCette page est également disponible en français.
Passer en françaisBu sayfa Türkçe olarak da mevcut.
Türkçe sürüme geçExplore the Haber Paper news archive, editorial policies and categories in Turkish, English and available Arabic, French and Spanish translations. Page 138.
2142 stories
EnergySource review period:
In a Wellficent interview, ENPRODE CEO Yuksel Guler discussed geopolitics, energy infrastructure and electricity demand.

EconomyEvent / data period:
The government says 14 cluster investment plans worth ₹3,446 crore have been approved under a ₹60,000 crore vocational-training scheme; these are implementation milestones, not job or wage outcomes.
EnergyEvent / data period:
The team described laboratory results and savings scenarios; a continuous pilot and technology validation remain proposals.
EconomyEvent / data period:
The commerce minister called for an explanation of a cited Tk520/kg retail price; container estimates came from traders and cover unlike periods.
BusinessEvent / data period:
At a Dhaka fair opening, the minister compared possible per-tonne values for raw jute and finished products; the figures are potential, not recorded sales.
AgricultureEvent / data period:
BSS describes farmer experiences and project-reported capacity; installation counts and outcome claims are attributed to officials and local users.

AgricultureEvent / data period:
Signature Rice shipped 5,000 tonnes and plans larger deliveries later in 2026; national export totals and company targets remain separate measures.
AgricultureEvent / data period:
A 300,000-litre-per-day Ujjain plant received a foundation stone, while a smaller Bhopal dairy and state laboratory were inaugurated; proposed capacity is not yet operating output.
FinanceEvent / data period:
KUSKOP’s TEKUN-run scheme offers eligible Indian-community entrepreneurs loans of up to RM30,000 at a 3% annual profit rate, with applications open through 8 November.
BusinessEvent / data period:
Malaysia’s Companies Commission paired digital-business training with information on free registration; the 226,273 SPPP registrations are a separate national cumulative count through 15 September.
EconomyEvent / data period:
Visits at 200 monitored sites rose 16.3% year on year and operating revenue was 210 million yuan; the 16 AAAAA sites are a subset.
EnergyEvent / data period:
The CPC Jet A-1 system includes a planned 21-kilometre airport pipeline and 92,000 cubic metres of tanks; a separate CPSTL project adds 40,000 cubic metres. Both remain under construction.
A multilingual perspective on the global economy.