Our standards
HABER PAPER / NEWSROOM

Search: Contratistas EPC

94 stories

Browse topics

Contratistas EPC: 94 results · Clear search

Plain gas compressor connected to a large pipeline with a valve and pressure housing.
AI-generated symbolic illustration. Conceptual illustration; no actual person, site, document, product design, completed project or measured result is depicted.
1 min read

EnergySource review period:

Lee Engineering builds compressor stations to unlock Escravos–Lagos gas capacity

Nigeria’s presidency says two compressor stations in Edo State are needed to enable the pipeline to use its expanded design capacity of 2.3 billion standard cubic feet a day.

Source: The State House, Abuja
1 min read

AgricultureEvent / data period:

SABIC AN takes final investment decision on ammonia and urea complex

The SAN-7 project is planned to include 1.2 million tonnes a year of ammonia capacity and two urea units totaling 2.6 million tonnes a year, with construction due to start in late 2026.

Source: SABIC Agri-Nutrients / SABIC
2 min readWith data

AgricultureEvent / data period:

Jordan reviews design for 52-km King Abdullah Canal rehabilitation

The Jordan Valley Authority reviewed design criteria for rehabilitation of about 52 km of canal, funded by Germany’s BMZ through KfW. The work remains at design review; cost, construction timing and water savings were not reported.

Source: Jordan Valley Authority, reported by Petra
HABER PAPER

Five editions. One wider view.

A multilingual perspective on the global economy.