BusinessEvent / data period:
Shvabe upgrades fibre-optic data links for subsea gas production
Shvabe reports tested subsea gas communications equipment with a line range of up to 70 km and a data rate of up to 10 Mbit/s.
هذه الصفحة متاحة أيضًا باللغة العربية.
التبديل إلى العربيةEsta página también está disponible en español.
Cambiar a españolCette page est également disponible en français.
Passer en françaisBu sayfa Türkçe olarak da mevcut.
Türkçe sürüme geçOil and gas production, infrastructure, trade and investment, distinguishing announcements from realised results. Page 4.
71 stories
BusinessEvent / data period:
Shvabe reports tested subsea gas communications equipment with a line range of up to 70 km and a data rate of up to 10 Mbit/s.
EnergyEvent / data period:
The September 11 release outlined planned TNF-2026 displays of an 8 MW modular power centre and dual-fuel marine turbine solutions.
EnergyEvent / data period:
The company reported a combined capacity increase of 2 million cubic metres a day and project investment of RUB 10 billion.
EconomyEvent / data period:
SSB’s seasonally adjusted measure combines oil and gas extraction, mining, manufacturing and electricity supply.
EnergyEvent / data period:
NNPC Retail agreed to sell petrol at cost within 30 days, while the government said it was negotiating a N1,350-per-litre cost ceiling.
EnergyEvent / data period:
At a meeting chaired by Prime Minister Kamil Idris, the energy minister said additional petroleum products had been provided for productive and service sectors.
EnergyEvent / data period:
Fujairah hosted the 14th Energy Markets Forum on 6–7 October. WAM reported 34 sessions over two days, with discussions covering oil and gas flows, the Strait of Hormuz, energy security and the resilience of trade corridors.
EnergyEvent / data period:
The Republic of the Congo’s Council of Ministers approved three draft decrees concerning SNPC’s Lidongo and Marine XXIX-A permits and ENI Congo’s Marine XXIV block. The measures concern permit boundaries and Lidongo’s term.
EnergyEvent / data period:
SOCAR, EPS and Srbijagas signed a shareholders’ agreement to develop a 500 MW combined-cycle gas plant in Niš. The release does not say construction has started or the facility is operating.
EnergyEvent / data period:
National Iranian Oil Company chief Hamid Bord said associated-gas capture had risen from about 5 million to 15 million cubic metres per day. He also set out a higher year-end target.
EnergyEvent / data period:
SOCAR said it signed energy and technology documents with ExxonMobil, Comstock Resources, Apollo and other companies at an investment forum in Baku. Several items are cooperation frameworks or evaluations rather than binding investment or sales decisions.
EnergyEvent / data period:
Egypt’s petroleum minister said average daily gas consumption rose from 6,458.36 million cubic feet in winter 2025–26 to 7,281.56 million cubic feet in summer 2026. The comparison uses seasonal averages.
A multilingual perspective on the global economy.