
BusinessEvent / data period:
Madrid to renew air conditioning on Metro Line 1
Madrid will replace the cooling units on Metro Line 1 trains under a planned investment exceeding €2.8 million.
Published:
هذه الصفحة متاحة أيضًا باللغة العربية.
التبديل إلى العربيةEsta página también está disponible en español.
Cambiar a españolCette page est également disponible en français.
Passer en françaisBu sayfa Türkçe olarak da mevcut.
Türkçe sürüme geçSource-linked stories explicitly associated with this identity. Story cards distinguish the event or data period from publication time.
3 stories

BusinessEvent / data period:
Madrid will replace the cooling units on Metro Line 1 trains under a planned investment exceeding €2.8 million.
Published:

BusinessEvent / data period:
Madrid Metro launched remote assistance for 214 ticket machines across 47 stations; video calls will be available on 72 of the machines.
Published:
EnergyEvent / data period:
The project includes 12.4 MWp of solar capacity and 25 MWh of storage; heat pumps are expected to replace about 2.9 GWh of gas use annually.
Published:
A multilingual perspective on the global economy.