Story details

Stellantis and GreenYellow presented their flexible electrification project at the company’s Madrid industrial plant on 20 October. The system combines electrified thermal uses, on-site solar generation and battery storage.

The companies said heat pumps replacing gas boilers would displace about 2.9 GWh of annual gas consumption and reduce emissions from those thermal uses by 57%. The project also includes 12.4 MWp of solar capacity, including a 4.6 MWp ground-mounted plant expected to generate about 7 GWh annually, and 25 MWh of battery storage.