EnergyEvent / data period:
Afghan ministry and refinery leaders discuss operations and standards
Refinery managers and the Ministry of Mines and Petroleum reviewed capacity, processes and product quality.
هذه الصفحة متاحة أيضًا باللغة العربية.
التبديل إلى العربيةEsta página también está disponible en español.
Cambiar a españolCette page est également disponible en français.
Passer en françaisBu sayfa Türkçe olarak da mevcut.
Türkçe sürüme geçElectricity, oil, natural gas, renewables, energy investment and emissions data. Follow production, capacity and price developments with their original sources. Page 19.
515 stories

EnergyEvent / data period:
Refinery managers and the Ministry of Mines and Petroleum reviewed capacity, processes and product quality.
EnergyEvent / data period:
Work starting October 1 may require temporary outages, with schedules to be announced by the ministry.
EnergyEvent / data period:
Kamil Idris inspected fuel availability with the energy minister and Khartoum governor on September 30, urging faster service and additional supplies; officials gave no volumes, prices or distribution timetable.
EnergyEvent / data period:
The programme is set to include 11 strategic conference themes and a new Energy Security Forum.
EnergyEvent / data period:
After a September 22 site visit, officials said the Brazzaville data centre is targeted to open by year-end and draw support from Kintélé solar power.
EnergyEvent / data period:
The assembly’s Petroleum Committee received a ministry budget briefing from Undersecretary Santino Ayuel Longar, who cited operational challenges and sought legislative support for the ministry’s development plan.
EnergyEvent / data period:
The hydrocarbons minister opened the multi-fuel facility built by Southerpec and subsidiaries on September 19.
EnergyEvent / data period:
The government and CWP Global signed a long-term framework on September 16; the developer says the project is at FEED stage and targets a final investment decision before 2030.
EnergyEvent / data period:
The 2026 peak was 17,540 MW, down 70 MW year on year despite new facility connections, the ministry said.
EnergyEvent / data period:
The project is estimated to cut annual emissions by 26,000 tonnes, about 20% of emissions from police buildings.
EnergyEvent / data period:
A converted truck began operational trials in an open pit on September 10; performance data have not been disclosed.
EnergyEvent / data period:
The facility near Clive is designed to store up to 1.5 million tonnes of CO₂ a year in its initial phase.
A multilingual perspective on the global economy.