EconomyEvent / data period:
Work begins on $164 million water project for Kananga
DR Congo has launched an approximately $164 million project to upgrade and expand water infrastructure in Kananga.
433 stories
Electricidad: 433 results · Clear search
EconomyEvent / data period:
DR Congo has launched an approximately $164 million project to upgrade and expand water infrastructure in Kananga.
EnergyEvent / data period:
A ministerial order puts online a platform intended to help users identify and review potential hydropower sites across the country.
BusinessEvent / data period:
Hassan Muhammed attributed the figures to manufacturing policy measures; the report gives no calculation method or comparison series for the capacity figure.
EconomyEvent / data period:
In an Independence Day address, the president said growth exceeded 4% and 2025 non-oil exports topped $6 billion.
AgricultureEvent / data period:
The 2026–27 plan includes 320,000 feddans of wheat and preparations for farmer finance, including a solar-energy facility.
FinanceEvent / data period:
The September 30 cabinet approved draft laws to ratify membership in TDB and ATIDI and a draft decree setting rules for the Rural Electrification Fund.
EnergyEvent / data period:
A regulator–UNDP workshop focused on pricing, consumer protection and operator viability; no new tariff was announced.
EnergyEvent / data period:
Power cables feeding depot pumps were damaged during construction excavation; a temporary generator kept distribution running while repairs were under way.
EnergyEvent / data period:
A grant-funded project fitted six buildings and is expected by the municipality to cut electricity costs by 70–80%.
BusinessEvent / data period:
The first phase is planned at 1 GWh a year with investment above EGP2 billion; a later phase targets 5 GWh.
EnergyEvent / data period:
The Bill Clinton Drive site combines 16 petrol pumps and two diesel pumps with electric-vehicle charging, LPG and other retail services.
BusinessEvent / data period:
Vodafone Business, Elsewedy Electric and Cassava plan 20 MW in three years, with a stated path to 200 MW.
A multilingual perspective on the global economy.