AgricultureEvent / data period:
Sarkin-Pawa-Kaduna plan identifies at least 388,682 hectares for urgent intervention
ACReSAL’s 21 October plan proposes land and water measures in a 3.88-million-hectare catchment affected by flooding and erosion.
هذه الصفحة متاحة أيضًا باللغة العربية.
التبديل إلى العربيةEsta página también está disponible en español.
Cambiar a españolCette page est également disponible en français.
Passer en françaisBu sayfa Türkçe olarak da mevcut.
Türkçe sürüme geçDevelopments in the world economy, international trade, finance, energy, agriculture and food supply. Source-linked reporting appears in this section. Page 7.
2043 stories
AgricultureEvent / data period:
ACReSAL’s 21 October plan proposes land and water measures in a 3.88-million-hectare catchment affected by flooding and erosion.

BusinessEvent / data period:
Hole WD-26-18 returned 11.65 metres at 7.13% copper equivalent, including 6.70 metres at 9.93%; the company also reported an overlying copper stringer interval.

BusinessEvent / data period:
One hole returned 110 metres at 1.86% copper equivalent; results from 14 of 43 completed 2026 holes had been reported.
BusinessEvent / data period:
The companies filed the meeting circular; proposed consideration is C$0.084 cash and 0.0763 QeM shares per Plurilock share.

BusinessEvent / data period:
Phase 5, scheduled to start on 22 October, aims to extend the Prodigy zone and test two previously undrilled geophysical targets to its north.
EconomyEvent / data period:
The province’s exports declined 0.9% and imports 5.7% month over month in August; exports were down 2.7% year over year for the first eight months while imports rose 1.3%.

BusinessEvent / data period:
The company reported target-style alteration in all 22 holes; two holes had been sampled, with assays still pending.

BusinessEvent / data period:
The region will fund cleaning, upkeep and public-realm work on provincial, municipal and inter-municipal roads.

BusinessEvent / data period:
The company reports 49 holes drilled, with assays received for 28 and pending for 21; the update does not yet provide a new resource estimate.

BusinessEvent / data period:
The companies introduced edge-based AI agents focused on operational-technology monitoring, cybersecurity and energy optimization.

BusinessEvent / data period:
The reference design aims to combine NVIDIA Vera Rubin infrastructure with power, liquid cooling and IT space in a pre-engineered modular system.
BusinessEvent / data period:
The electrical distributor announced a future investment envelope for AI applications in inventory, sales and product data.
A multilingual perspective on the global economy.