Scotland’s renewable electricity output sets Q2 record
Scotland generated 9.1 TWh of renewable electricity in April–June, the highest total for a second quarter, according to the government’s quarterly report.
Renewable sources generated 9.1 terawatt-hours of electricity in Scotland in the second quarter of 2026. The Scottish Government’s Q2 energy statistics, published on 29 September, say this was the highest renewable output recorded for any second quarter.
The report put renewable generation capacity at 18.4 gigawatts at the end of June 2026, up 3.3% from the end of Q2 2025. Generation and installed capacity are separate measures; the 9.1 TWh figure refers only to electricity produced during April–June.
HABER PAPER / DATA
Behind the numbers
Inspect the source, read the data, make your own analysis.
Indicators
Scottish renewable electricity generation
Quarterly renewable electricity generated in Scotland, as reported by the Scottish Government.
Renewable electricity generation
9.1 TWhData period: 2026-04–2026-06 · Observed
Source and methodology
Haber Paper source-linked editorial data compilation; underlying sources retain their separate reuse terms.
Iraq’s Ministry of Planning held a data-analysis course using seven quality tools for State Oil Marketing Organization (SOMO) staff from 5 to 11 October. The ministry’s 11 October announcement said 29 company employees took part.
Egypt’s General Petroleum Corporation reported 12 oil discoveries and a 22% reduction in energy use in fiscal 2025/26. It put average daily production at about 77,000 barrels of oil equivalent.
Source: Egypt State Information Service / Egyptian General Petroleum Corporation
Google Analytics can measure visits and site activity using cookies if you allow it. You can change your choice later.
Measurement and privacy details
Google Analytics measurement starts only if you allow it. After consent, automatic measurement may cover scrolls, outbound link clicks, downloads, video engagement, site searches and basic form interactions; search terms may be detected from URL parameters. This site’s own code does not send form field values; email redaction in automatic measurement is best-effort, not guaranteed. Our manual page-view event uses a cleaned URL. You can change your choice later. Visits that begin with consent may also send numeric LCP, INP and CLS performance measurements after Analytics loads. A first or later grant starts this on the next page load; withdrawing consent stops these performance reports for this page. The preference cookie lasts six months; advertising measurement and personalization stay off.
Your browser is sending a Global Privacy Control signal. Analytics is off by default; you may explicitly change this choice here.