Story details
DOE selected 21 geothermal projects for over USD 99 million in proposed support.
Five target field tests and 16 exploration drilling; selection does not guarantee funding.
هذه الصفحة متاحة أيضًا باللغة العربية.
التبديل إلى العربيةEsta página también está disponible en español.
Cambiar a españolCette page est également disponible en français.
Passer en françaisBu sayfa Türkçe olarak da mevcut.
Türkçe sürüme geçEnergyWORLD
Field tests and exploration drilling.

DOE selected 21 geothermal projects for over USD 99 million in proposed support.
Five target field tests and 16 exploration drilling; selection does not guarantee funding.
Language editions

EnergySource review period:
Official figures presented for 2022 and 2023 diverged; the committee requested explanations, while the next hearing date remains unannounced.

EnergySource review period:
Nigeria’s presidency says two compressor stations in Edo State are needed to enable the pipeline to use its expanded design capacity of 2.3 billion standard cubic feet a day.

EnergyEvent / data period:
The explorer would retain 20% in each Saskatchewan property as its partner takes a larger funding share.
A multilingual perspective on the global economy.