Saipem’s September 1 release reports its pre-FEED selection for Synhelion’s proposed synthetic-fuels plant at RWE’s Chemiepark Knapsack site in Hürth.
The work defines plant configuration through preliminary engineering; it is not a final construction decision. Linking fuel synthesis, existing site infrastructure and permitting needs within one scope document matters for clarity of subsequent tender packages.
Combined Group says it won a KWD 9.7m tender for repair and revamping services at Kuwait Oil Company production facilities in West Kuwait. The execution period is five years.
Google Analytics can measure visits and site activity using cookies if you allow it. You can change your choice later.
Measurement and privacy details
Google Analytics measurement starts only if you allow it. After consent, automatic measurement may cover scrolls, outbound link clicks, downloads, video engagement, site searches and basic form interactions; search terms may be detected from URL parameters. This site’s own code does not send form field values; email redaction in automatic measurement is best-effort, not guaranteed. Our manual page-view event uses a cleaned URL. You can change your choice later. Visits that begin with consent may also send numeric LCP, INP and CLS performance measurements after Analytics loads. A first or later grant starts this on the next page load; withdrawing consent stops these performance reports for this page. The preference cookie lasts six months; advertising measurement and personalization stay off.
Your browser is sending a Global Privacy Control signal. Analytics is off by default; you may explicitly change this choice here.