Dubai Media Office’s August 18, 2025 announcement reports Empower’s design contract for a Dubai Science Park cooling plant. Plans envisage 47,000 RT serving around 80 buildings.
The source schedules construction for the end of Q1 2026. That historical forecast does not prove construction started. The event remains dated 2025, and design scope is not presented as a completed facility.
A non-exclusive memorandum sets a framework for evaluating offshore drilling opportunities, starting in Egypt; it does not award a project or commit either company to a specific operation.
Source: Saipem — Saipem and Modern Drilling Company join forces to pursue new offshore drilling opportunities
Combined Group says it won a KWD 9.7m tender for repair and revamping services at Kuwait Oil Company production facilities in West Kuwait. The execution period is five years.
Google Analytics can measure visits and site activity using cookies if you allow it. You can change your choice later.
Measurement and privacy details
Google Analytics measurement starts only if you allow it. After consent, automatic measurement may cover scrolls, outbound link clicks, downloads, video engagement, site searches and basic form interactions; search terms may be detected from URL parameters. This site’s own code does not send form field values; email redaction in automatic measurement is best-effort, not guaranteed. Our manual page-view event uses a cleaned URL. You can change your choice later. Visits that begin with consent may also send numeric LCP, INP and CLS performance measurements after Analytics loads. A first or later grant starts this on the next page load; withdrawing consent stops these performance reports for this page. The preference cookie lasts six months; advertising measurement and personalization stay off.
Your browser is sending a Global Privacy Control signal. Analytics is off by default; you may explicitly change this choice here.