Burns & McDonnell’s June 24 release describes the $40 million De Soto expansion with CAS Constructors. Capacity rose from 1.3 to 2.6 million gallons daily; operations began in March.
The project used progressive design-build. June coverage concerns the opening ceremony and completion announcement, not a new EPC award. Battery manufacturing growth also requires planning municipal water infrastructure as part of the energy transition.
Combined Group says it won a KWD 9.7m tender for repair and revamping services at Kuwait Oil Company production facilities in West Kuwait. The execution period is five years.
Google Analytics can measure visits and site activity using cookies if you allow it. You can change your choice later.
Measurement and privacy details
Google Analytics measurement starts only if you allow it. After consent, automatic measurement may cover scrolls, outbound link clicks, downloads, video engagement, site searches and basic form interactions; search terms may be detected from URL parameters. This site’s own code does not send form field values; email redaction in automatic measurement is best-effort, not guaranteed. Our manual page-view event uses a cleaned URL. You can change your choice later. Visits that begin with consent may also send numeric LCP, INP and CLS performance measurements after Analytics loads. A first or later grant starts this on the next page load; withdrawing consent stops these performance reports for this page. The preference cookie lasts six months; advertising measurement and personalization stay off.
Your browser is sending a Global Privacy Control signal. Analytics is off by default; you may explicitly change this choice here.