ADNOC said on October 5 that it had signed a multi-year liquefied natural gas sales and purchase agreement with Thailand-based energy and infrastructure group Gulf Group. Under the deal, ADNOC Trading will deliver approximately 2 million tonnes of LNG, with deliveries due to start in 2027.
The announcement says the agreement extends a first LNG supply deal signed by the two companies in 2025. It gives the total volume and the planned start year, but does not specify an annual delivery rate or an end date for the contract.
The ADNOC–Gulf Group agreement shows why total contracted tonnes, annual capacity and future marketable supply must remain distinct.
Source: ADNOC
AI-generated symbolic illustration. Imagined fuel-import record reconciliation; no actual ledger, figures, storage site or proven misconduct is depicted.
Official figures presented for 2022 and 2023 diverged; the committee requested explanations, while the next hearing date remains unannounced.
Source: National Assembly Library Trust Fund (NALTF)
AI-generated symbolic illustration. Conceptual illustration; no actual person, site, document, product design, completed project or measured result is depicted.
Nigeria’s presidency says two compressor stations in Edo State are needed to enable the pipeline to use its expanded design capacity of 2.3 billion standard cubic feet a day.
Google Analytics can measure visits and site activity using cookies if you allow it. You can change your choice later.
Measurement and privacy details
Google Analytics measurement starts only if you allow it. After consent, automatic measurement may cover scrolls, outbound link clicks, downloads, video engagement, site searches and basic form interactions; search terms may be detected from URL parameters. This site’s own code does not send form field values; email redaction in automatic measurement is best-effort, not guaranteed. Our manual page-view event uses a cleaned URL. You can change your choice later. Visits that begin with consent may also send numeric LCP, INP and CLS performance measurements after Analytics loads. A first or later grant starts this on the next page load; withdrawing consent stops these performance reports for this page. The preference cookie lasts six months; advertising measurement and personalization stay off.
Your browser is sending a Global Privacy Control signal. Analytics is off by default; you may explicitly change this choice here.