EnergyEvent / data period:
UAE energy minister discusses energy connectivity and cooperation in Kazakhstan
Suhail Al Mazrouei’s visit included KIOGE 2026 and a meeting with Kazakhstan’s energy vice minister; no new energy agreement was announced.
262 stories
Petrol: 262 results · Clear search
EnergyEvent / data period:
Suhail Al Mazrouei’s visit included KIOGE 2026 and a meeting with Kazakhstan’s energy vice minister; no new energy agreement was announced.
EnergyEvent / data period:
The three-day oil and gas technology event included 1,206 companies; 250 of about 1,300 technical papers were selected for 52 sessions.
EnergyEvent / data period:
The company’s October 1 statement cites potential support for more than 40,000 jobs, but announces no new final investment decision or contract.
EnergyEvent / data period:
The pricing committee set E-Plus 91 at AED4.21 and Super 98 at AED4.40 per litre; diesel was set at AED4.80.
EnergyEvent / data period:
Occidental’s CEO discussed advanced recovery, the company’s portfolio and rising electricity demand.
EnergyEvent / data period:
A Fox Business interview covered Chevron’s second-quarter results, its Microsoft deal and energy security.
EnergySource review period:
In a Wellficent interview, ENPRODE CEO Yuksel Guler discussed geopolitics, energy infrastructure and electricity demand.
EnergyEvent / data period:
The team described laboratory results and savings scenarios; a continuous pilot and technology validation remain proposals.
EnergyEvent / data period:
The CPC Jet A-1 system includes a planned 21-kilometre airport pipeline and 92,000 cubic metres of tanks; a separate CPSTL project adds 40,000 cubic metres. Both remain under construction.
EconomyEvent / data period:
The board enabled SDR 114.052 million in financing; growth and current-account figures remain estimates or projections.
EnergyEvent / data period:
The deputy minister cited a 2,500–3,000 barrels-a-day potential range across several fields, not realized added output; the national one-million-barrel-a-day target remains set for 2029–2030.
EconomyEvent / data period:
The agreement awaits management approval; a Staff-Monitored Program does not itself provide a loan or new financing.
A multilingual perspective on the global economy.