{"version":"1","article":{"id":"us-doe-pjm-emergency-order-october-2026","slug":"us-doe-pjm-emergency-order-october-2026","language":"en","url":"https://haberpaper.com/en/news/us-doe-pjm-emergency-order-october-2026","api_url":"https://haberpaper.com/api/v1/articles/us-doe-pjm-emergency-order-october-2026?lang=en","title":"DOE issues four-day emergency grid order for PJM","summary":"The US Department of Energy authorized PJM to dispatch generation and backup resources ahead of forecast high demand and planned outages in the Mid-Atlantic.","category":"energy","region":"world","topics":["electrical-materials"],"published_at":"2026-10-13T20:11:53+03:00","modified_at":"2026-10-13T20:11:53+03:00","publication_basis":"publication-record","event_period":"2026-10-13","event_period_basis":"event-or-reference-period","sources":[{"name":"U.S. Department of Energy","url":"https://www.energy.gov/articles/energy-secretary-secures-mid-atlantic-grid-ahead-anticipated-stressed-system-conditions","checkedAt":"2026-10-13","publishedAt":"2026-10-12"}],"translations":[{"language":"tr","url":"https://haberpaper.com/tr/news/us-doe-pjm-emergency-order-october-2026","api_url":"https://haberpaper.com/api/v1/articles/us-doe-pjm-emergency-order-october-2026?lang=tr"},{"language":"en","url":"https://haberpaper.com/en/news/us-doe-pjm-emergency-order-october-2026","api_url":"https://haberpaper.com/api/v1/articles/us-doe-pjm-emergency-order-october-2026?lang=en"},{"language":"ar","url":"https://haberpaper.com/ar/news/us-doe-pjm-emergency-order-october-2026","api_url":"https://haberpaper.com/api/v1/articles/us-doe-pjm-emergency-order-october-2026?lang=ar"},{"language":"fr","url":"https://haberpaper.com/fr/news/us-doe-pjm-emergency-order-october-2026","api_url":"https://haberpaper.com/api/v1/articles/us-doe-pjm-emergency-order-october-2026?lang=fr"},{"language":"es","url":"https://haberpaper.com/es/news/us-doe-pjm-emergency-order-october-2026","api_url":"https://haberpaper.com/api/v1/articles/us-doe-pjm-emergency-order-october-2026?lang=es"}],"data_types":["table"],"data":{"version":1,"blocks":[{"id":"verified-indicators","type":"table","title":{"tr":"DOE’nin duyurduğu yedek üretim tahmini","en":"DOE backup generation estimate","ar":"تقدير وزارة الطاقة للتوليد الاحتياطي","fr":"Estimation du DOE sur la production de secours","es":"Estimación del DOE sobre generación de respaldo"},"description":{"tr":"DOE tahmini ülke çapındaki kullanılmayan yedek üretimi ifade eder; PJM emrinin bölgesel toplamı değildir.","en":"DOE estimate refers to unused backup generation nationwide, not a regional total for the PJM order.","ar":"يشير تقدير الوزارة إلى التوليد الاحتياطي غير المستخدم على مستوى البلاد، وليس إلى إجمالي إقليمي لأمر PJM.","fr":"L’estimation du DOE porte sur la production de secours inutilisée à l’échelle nationale, pas sur le total régional de l’ordre PJM.","es":"La estimación del DOE se refiere a la generación de respaldo sin usar a escala nacional, no al total regional de la orden de PJM."},"methodology":{"tr":"DOE’nin yayımladığı ulusal tahmini kaydediyor; bölgesel tahsis çıkarımı yapmıyor. Sayısal değerler kaynak ölçeğini korur; sınır işaretleri kesin eşitlikten ayrıdır. Sıralamada birim ve gösterge kapsamı birlikte dikkate alınmalıdır.","en":"Records DOE’s national estimate and does not infer a regional allocation. Numeric values retain source scales; bounds are distinct from exact equality. Sorting must account for units and indicator scope.","ar":"يسجل تقدير الوزارة الوطني ولا يستنتج توزيعاً إقليمياً. تحتفظ القيم العددية بمقياس المصدر؛ والحدود تختلف عن المساواة الدقيقة. يجب مراعاة الوحدة ونطاق المؤشر عند الترتيب.","fr":"Consigne l’estimation nationale du DOE sans en déduire une répartition régionale. Les valeurs numériques conservent l’échelle de la source ; les bornes se distinguent de l’égalité exacte. Le tri doit tenir compte des unités et du périmètre de l’indicateur.","es":"Registra la estimación nacional del DOE sin inferir una asignación regional. Los valores numéricos conservan la escala de la fuente; los límites se distinguen de la igualdad exacta. La ordenación debe tener en cuenta las unidades y el alcance del indicador."},"sourceUrls":["https://www.energy.gov/articles/energy-secretary-secures-mid-atlantic-grid-ahead-anticipated-stressed-system-conditions"],"updatedAt":"2026-10-13T14:46:23Z","columns":[{"key":"indicator","type":"text","language":"en","label":{"tr":"Gösterge (İngilizce)","en":"Indicator (English)","ar":"المؤشر (بالإنجليزية)","fr":"Indicateur (anglais)","es":"Indicador (inglés)"}},{"key":"reported","type":"text","language":"en","label":{"tr":"Kaynak değeri ve birimi","en":"Source value and unit","ar":"القيمة والوحدة في المصدر","fr":"Valeur et unité de la source","es":"Valor y unidad de la fuente"}},{"key":"period","type":"text","label":{"tr":"Dönem veya duyuru tarihi","en":"Period or announcement date","ar":"الفترة أو تاريخ الإعلان","fr":"Période ou date d’annonce","es":"Periodo o fecha del anuncio"}},{"key":"basis","type":"text","language":"en","label":{"tr":"Veri temeli (İngilizce)","en":"Data basis (English)","ar":"أساس البيانات (بالإنجليزية)","fr":"Base des données (anglais)","es":"Base del dato (inglés)"}},{"key":"value","type":"number","label":{"tr":"Sayısal değer (kaynak ölçeği)","en":"Numeric value (source scale)","ar":"القيمة العددية (مقياس المصدر)","fr":"Valeur numérique (échelle de la source)","es":"Valor numérico (escala de la fuente)"}},{"key":"unit","type":"text","language":"en","label":{"tr":"Kaynak birimi (İngilizce)","en":"Source unit (English)","ar":"وحدة المصدر (بالإنجليزية)","fr":"Unité de la source (anglais)","es":"Unidad de la fuente (inglés)"}},{"key":"bound","type":"text","language":"en","label":{"tr":"Eşitlik veya sınır işareti","en":"Equality or bound qualifier","ar":"علامة المساواة أو الحد","fr":"Égalité ou indication de borne","es":"Igualdad o indicador de límite"}}],"rows":[{"indicator":"Unused backup generation (national estimate)","reported":"more than 35 GW (DOE national estimate)","period":"2026-10-12","basis":"estimate","value":35,"unit":"GW","bound":"greater-than"}]}]},"data_compilations":[{"id":"verified-indicators","creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null}],"data_downloads":[{"id":"verified-indicators","formats":{"json":"https://haberpaper.com/api/v1/articles/us-doe-pjm-emergency-order-october-2026/data/verified-indicators?lang=en&format=json","csv":"https://haberpaper.com/api/v1/articles/us-doe-pjm-emergency-order-october-2026/data/verified-indicators?lang=en&format=csv"}}],"content":{"paragraphs":["On October 12, the Department of Energy announced an emergency order directing PJM Interconnection to dispatch specified generating units as needed to maintain reliability. The agency cited elevated demand, a high rate of planned generator outages during autumn maintenance, and planned transmission outages in the region.","The order is effective October 13–16, 2026. PJM may call on backup generation as a last resort before or during an Energy Emergency Alert 3. DOE estimated that more than 35 gigawatts of unused backup generation is available nationwide; that figure is not a regional capacity total for this order."],"key_points":[],"sections":[]},"text":"The US Department of Energy authorized PJM to dispatch generation and backup resources ahead of forecast high demand and planned outages in the Mid-Atlantic.\n\nOn October 12, the Department of Energy announced an emergency order directing PJM Interconnection to dispatch specified generating units as needed to maintain reliability. The agency cited elevated demand, a high rate of planned generator outages during autumn maintenance, and planned transmission outages in the region.\n\nThe order is effective October 13–16, 2026. PJM may call on backup generation as a last resort before or during an Energy Emergency Alert 3. DOE estimated that more than 35 gigawatts of unused backup generation is available nationwide; that figure is not a regional capacity total for this order.","corrections":[],"editorial_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"},"section_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"}}}
