{"version":1,"article_url":"https://haberpaper.com/tr/news/uae-sewa-transmission-projects-sharjah-2026","compilation":{"creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null},"block":{"id":"sharjah-transmission-projects","type":"table","title":{"tr":"Sharjah iletim projeleri","en":"Sharjah transmission projects","ar":"مشاريع نقل الكهرباء في الشارقة","fr":"Projets de transport à Charjah","es":"Proyectos de transmisión de Sharjah"},"description":{"tr":"SEWA’nın tamamlandığını bildirdiği iki çalışmanın açıklanan kapsam ve maliyetleri.","en":"Reported scope and costs for two works SEWA says are complete.","ar":"النطاق والتكاليف المعلنة لمشروعين قالت سيوا إنهما اكتملتا.","fr":"Portée et coûts annoncés de deux travaux achevés selon SEWA.","es":"Alcance y costes comunicados de dos obras que SEWA declara terminadas."},"methodology":{"tr":"Maliyetler nominal AED’dir. Kablo ve trafo merkezi sayısı Havalimanı Projesi’ne aittir. İki projenin maliyetleri toplamı hesaplandığında 341,493 milyon AED’dir; kaynak genel toplamı ‘341,493 milyon AED’den fazla’ olarak aktarır.","en":"Costs are nominal AED. Cable length and substation count refer to the Airport Project. The sum of the two costs is the lower bound implied by the source’s ‘more than AED341.493m’ statement, not an exact reported total.","ar":"التكاليف اسمية بالدرهم. ويخص طول الكابل وعدد المحطات مشروع المطار. ومجموع التكلفتين حد أدنى مستنتج من بيان «أكثر من 341.493 مليون درهم»، وليس إجمالياً دقيقاً أوردته الهيئة.","fr":"Les coûts sont nominaux en AED. La longueur et le nombre de postes concernent le projet de l’aéroport. Leur somme constitue une borne inférieure déduite du seuil « plus de 341,493 millions », pas un total exact publié.","es":"Los costes son nominales en AED. La longitud y las subestaciones corresponden al Proyecto del Aeropuerto. La suma es el límite inferior implícito en ‘más de 341,493 millones’, no un total exacto publicado."},"sourceUrls":["https://www.wam.ae/en/article/c2epfgc-sewa-announces-completion-220132-electricity"],"updatedAt":"2026-10-08T17:03:53+00:00","columns":[{"key":"project","label":{"tr":"Proje","en":"Project","ar":"المشروع","fr":"Projet","es":"Proyecto"},"type":"text","language":"en"},{"key":"voltage","label":{"tr":"Gerilim","en":"Voltage","ar":"الجهد","fr":"Tension","es":"Tensión"},"type":"text"},{"key":"cost","label":{"tr":"Açıklanan maliyet","en":"Reported cost","ar":"التكلفة المعلنة","fr":"Coût annoncé","es":"Coste comunicado"},"type":"number","unit":"million AED"},{"key":"scope","label":{"tr":"Fiziksel kapsam","en":"Physical scope","ar":"النطاق المادي","fr":"Portée physique","es":"Alcance físico"},"type":"text","language":"en"}],"rows":[{"project":"Airport Project","voltage":"132 kV","cost":235,"scope":"71.7 km underground cable; seven main substations connected"},{"project":"Overhead line upgrade","voltage":"220 kV","cost":106.493,"scope":"Upgrade of overhead transmission lines"}]}}
