{"version":1,"article_url":"https://haberpaper.com/en/news/uae-energy-pipeline-136-projects-210bn-eic-2026","compilation":{"creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null},"block":{"id":"uae-energy-pipeline","type":"metrics","title":{"tr":"BAE enerji proje hattı","en":"UAE energy project pipeline","ar":"محفظة مشاريع الطاقة في الإمارات"},"description":{"tr":"EIC’nin 22 Eylül 2026’da sunduğu, geliştirme aşamasındaki BAE enerji projeleri ve planlanan kapasiteler hakkındaki göstergeler.","en":"Indicators for UAE energy projects under development and planned capacity, presented by EIC on 22 September 2026.","ar":"مؤشرات مشاريع الطاقة الإماراتية قيد التطوير والقدرات المخططة، كما عرضها المجلس في 22 سبتمبر 2026."},"methodology":{"tr":"EIC açıklamasında yayımlanan EICDataStream toplam ve alt toplamları aynen derlenmiştir. Tahmini CAPEX, proje yatırımı taahhüdü değildir; yenilenebilir ve geleneksel kapasite değerleri geliştirme aşamasındaki projelere aittir. GCC karar sayıları BAE'ye özel değildir.","en":"EICDataStream totals and subsets published in the EIC release are transcribed as stated. Estimated CAPEX is not a project investment commitment; renewable and conventional capacity figures refer to projects under development. GCC investment-decision counts are not UAE-only.","ar":"جُمعت مجاميع ومجاميع فرعية من EICDataStream كما وردت في بيان المجلس. النفقات الرأسمالية التقديرية ليست التزاماً استثمارياً؛ وتشير قدرات المتجددة والتوليد التقليدي إلى مشاريع قيد التطوير. أعداد قرارات الاستثمار تخص دول مجلس التعاون ولا تقتصر على الإمارات."},"sourceUrls":["https://www.the-eic.com/MediaCentre/Detail?articleId=2694"],"updatedAt":"2026-10-04T20:10:38Z","items":[{"label":{"tr":"Geliştirme aşamasındaki enerji projesi","en":"Energy projects under development","ar":"مشاريع الطاقة قيد التطوير"},"value":136,"unit":"projects","period":"2026-09-22","basis":"observed","measure":{"id":"uae-energy-projects-under-development","unitCode":"count","geography":"united-arab-emirates","frequency":"irregular","aggregation":"stock","periodRole":"reference-period"}},{"label":{"tr":"Tahmini toplam sermaye harcaması","en":"Estimated total capital expenditure","ar":"إجمالي النفقات الرأسمالية التقديرية"},"value":210,"unit":"billion USD","period":"2026-09-22","basis":"estimate","measure":{"id":"uae-energy-project-estimated-capex","unitCode":"billion-usd","geography":"united-arab-emirates","frequency":"irregular","aggregation":"stock","periodRole":"reference-period"}},{"label":{"tr":"14 yenilenebilir projede izlenen kapasite","en":"Tracked capacity across 14 renewable projects","ar":"القدرة المسجلة عبر 14 مشروعاً متجدداً"},"value":17980,"unit":"MW","period":"2026-09-22","basis":"forecast","measure":{"id":"uae-renewable-capacity-under-development","unitCode":"mw","geography":"united-arab-emirates","frequency":"irregular","aggregation":"stock","periodRole":"reference-period"}},{"label":{"tr":"Dokuz geleneksel üretim projesinde izlenen kapasite","en":"Tracked capacity across nine conventional generation projects","ar":"القدرة المسجلة عبر تسعة مشاريع توليد تقليدي"},"value":12947,"unit":"MW","period":"2026-09-22","basis":"forecast","measure":{"id":"uae-conventional-generation-capacity-under-development","unitCode":"mw","geography":"united-arab-emirates","frequency":"irregular","aggregation":"stock","periodRole":"reference-period"}},{"label":{"tr":"GCC’de nihai yatırım kararına ulaşan yenilenebilir proje","en":"GCC renewable projects at final investment decision","ar":"مشاريع الطاقة المتجددة التي بلغت قرار الاستثمار النهائي في دول المجلس"},"value":28,"unit":"projects","period":"2026-09-22","basis":"observed","measure":{"id":"gcc-renewable-projects-at-final-investment-decision","unitCode":"count","geography":"gulf-cooperation-council","frequency":"irregular","aggregation":"stock","periodRole":"reference-period"}},{"label":{"tr":"GCC’de geliştirme aşamasındaki yenilenebilir proje","en":"GCC renewable projects under development","ar":"مشاريع الطاقة المتجددة قيد التطوير في دول المجلس"},"value":99,"unit":"projects","period":"2026-09-22","basis":"observed","measure":{"id":"gcc-renewable-projects-under-development","unitCode":"count","geography":"gulf-cooperation-council","frequency":"irregular","aggregation":"stock","periodRole":"reference-period"}},{"label":{"tr":"GCC’de nihai yatırım kararına ulaşan hidrojen projesi","en":"GCC hydrogen projects at final investment decision","ar":"مشاريع الهيدروجين التي بلغت قرار الاستثمار النهائي في دول المجلس"},"value":2,"unit":"projects","period":"2026-09-22","basis":"observed","measure":{"id":"gcc-hydrogen-projects-at-final-investment-decision","unitCode":"count","geography":"gulf-cooperation-council","frequency":"irregular","aggregation":"stock","periodRole":"reference-period"}},{"label":{"tr":"GCC’de geliştirme aşamasındaki hidrojen projesi","en":"GCC hydrogen projects under development","ar":"مشاريع الهيدروجين قيد التطوير في دول المجلس"},"value":39,"unit":"projects","period":"2026-09-22","basis":"observed","measure":{"id":"gcc-hydrogen-projects-under-development","unitCode":"count","geography":"gulf-cooperation-council","frequency":"irregular","aggregation":"stock","periodRole":"reference-period"}}]}}
