{"version":1,"article_url":"https://haberpaper.com/ar/news/tadweer-al-ain-materials-recovery-facility-upgrade-2026","compilation":{"creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null},"block":{"id":"al-ain-mrf-planned-capacity-and-diversion","type":"metrics","title":{"tr":"Al Ain tesisi: planlanan kapasite ve beklenen yönlendirme","en":"Al Ain facility: planned capacity and expected diversion","ar":"منشأة العين: الطاقة المخططة والتحويل المتوقع","fr":"Centre d’Al Ain : capacité prévue et détournement attendu","es":"Planta de Al Ain: capacidad prevista y desvío esperado"},"description":{"tr":"Tadweer’ın WAM’a açıkladığı proje kapasitesi ve beklenen yerel atık yönlendirme oranı; işletme sonucu değildir.","en":"Project capacity and expected local waste diversion reported by Tadweer to WAM; these are not operating results.","ar":"الطاقة المخططة وحصة تحويل النفايات المحلية المتوقعة كما أوردتها تدوير لوام؛ وليستا نتيجتين تشغيليتين.","fr":"Capacité du projet et détournement local attendu communiqués par Tadweer à WAM ; il ne s’agit pas de résultats d’exploitation.","es":"Capacidad del proyecto y desvío local esperado comunicados por Tadweer a WAM; no son resultados operativos."},"methodology":{"tr":"400.000 ton/yıl, faaliyette ölçülmüş girdi değil kaynakta bildirilen tasarım kapasitesidir; hedef/planlanan kapasite olarak işaretlenmiştir. Yaklaşık yüzde 60, şirketin beklenen depolamadan yönlendirme oranıdır ve tahmindir. Yüzde 80, Abu Dabi’nin 2031 emirlik ölçeğindeki hedefidir; tesis sonucu veya gözlem değildir. Gerçek tonaj, bileşim ve yönlendirme verisi açıklanmamıştır.","en":"400,000 tonnes per year is a source-reported design capacity, not measured operating intake, and is marked as a target/planned capacity. Approximately 60% is the company’s expected landfill-diversion share and is marked as a forecast. The 80% figure is Abu Dhabi’s emirate-wide 2031 ambition, not a facility result or observation. Actual tonnage, composition and diversion data are not reported.","ar":"400 ألف طن سنوياً هي طاقة تصميمية أوردها المصدر وليست مدخلات تشغيلية مقاسة، لذا تصنف كهدف/طاقة مخططة. ونحو 60 بالمئة حصة التحويل المتوقعة عن المكبات بحسب الشركة وتصنف كتوقع. أما 80 بالمئة فهي طموح أبوظبي على مستوى الإمارة لعام 2031، وليست نتيجة للمنشأة أو رصداً. ولم تنشر بيانات فعلية للوزن أو التركيب أو التحويل.","fr":"Les 400 000 tonnes par an correspondent à une capacité de conception communiquée par la source, et non à des apports mesurés ; la valeur est classée comme objectif/capacité prévue. Les quelque 60 % représentent la part de détournement des décharges attendue par l’entreprise et sont classés comme prévision. Les 80 % constituent l’ambition d’Abou Dhabi à l’échelle de l’émirat pour 2031, pas un résultat du centre ni une observation. Les tonnages, la composition et le détournement réels ne sont pas publiés.","es":"Las 400.000 toneladas anuales son una capacidad de diseño comunicada por la fuente, no entradas operativas medidas, y se clasifican como objetivo/capacidad prevista. Alrededor del 60% es la cuota de desvío de vertederos que espera la empresa y se marca como previsión. El 80% es la ambición de Abu Dabi para todo el emirato en 2031, no un resultado de la planta ni una observación. No se publican tonelajes, composición ni desvío reales."},"sourceUrls":["https://www.wam.ae/en/article/c2mg2kg-tadweer-group-reaches-50-milestone-transformation"],"updatedAt":"2026-10-08T20:46:54+03:00","items":[{"label":{"tr":"Tasarım kapasitesi, faaliyete geçtiğinde: yılda 400.000 ton","en":"Design capacity once operational: 400,000 tonnes per year","ar":"الطاقة التصميمية عند التشغيل: 400 ألف طن سنوياً","fr":"Capacité de conception à la mise en service : 400 000 tonnes par an","es":"Capacidad de diseño al entrar en servicio: 400.000 toneladas anuales"},"value":400000,"unit":"tonnes/year","period":"2026-10-07","basis":"target","measure":{"id":"al-ain-mrf-planned-annual-capacity","unitCode":"tonnes-per-year","geography":"al-ain-abu-dhabi-united-arab-emirates","frequency":"irregular","aggregation":"flow","periodRole":"announcement-date"}},{"label":{"tr":"Al Ain belediye atığının depolamadan yönlendirilmesi, şirket beklentisi: yaklaşık %60","en":"Al Ain municipal waste diverted from landfill, company expectation: approximately 60%","ar":"تحويل النفايات البلدية في العين عن المكبات، توقع الشركة: نحو 60 بالمئة","fr":"Déchets municipaux d’Al Ain détournés des décharges, prévision de l’entreprise : environ 60 %","es":"Residuos municipales de Al Ain desviados de vertederos, previsión de la empresa: aproximadamente 60%"},"value":60,"unit":"percent","period":"2026-10-07","basis":"forecast","measure":{"id":"al-ain-mrf-expected-landfill-diversion-share","unitCode":"percent","geography":"al-ain-abu-dhabi-united-arab-emirates","frequency":"irregular","aggregation":"rate","periodRole":"announcement-date"}},{"label":{"tr":"Abu Dabi’nin 2031 emirlik ölçekli depolamadan yönlendirme hedefi: %80","en":"Abu Dhabi emirate-wide landfill-diversion ambition for 2031: 80%","ar":"طموح أبوظبي على مستوى الإمارة للتحويل عن المكبات بحلول 2031: 80 بالمئة","fr":"Ambition d’Abou Dhabi à l’échelle de l’émirat pour le détournement d’ici 2031 : 80 %","es":"Ambición de Abu Dabi para todo el emirato de desvío para 2031: 80%"},"value":80,"unit":"percent","period":"2031","basis":"target","measure":{"id":"abu-dhabi-waste-diversion-policy-target","unitCode":"percent","geography":"abu-dhabi-united-arab-emirates","frequency":"annual","aggregation":"rate","periodRole":"reference-period"}}]}}
