{"version":1,"article_url":"https://haberpaper.com/en/news/smolensk-npp2-substation-modules-october-2026","compilation":{"creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null},"block":{"id":"smolensk-npp2-construction-infrastructure","type":"metrics","title":{"tr":"Smolensk NGS-2 hazırlık göstergeleri","en":"Smolensk NPP-2 preparation indicators"},"description":{"tr":"İnşaat üssü ekipman alım göstergeleri ile planlanan toplam ünite gücü.","en":"Construction-base procurement indicators and planned combined unit capacity."},"methodology":{"tr":"38 ihale/lot ve 5.332 ekipman sayısı 2026–2027 hazırlık dönemi kontratlamasına aittir; 2.400 MW ise iki planlı ünitenin toplam kurulu gücü olarak açıklanmıştır.","en":"The 38 lots and 5,332 equipment items relate to 2026–2027 preparatory contracting; 2,400 MW is the stated combined installed capacity of the two planned units."},"sourceUrls":["https://atommedia.online/press-releases/na-stroyploshchadku-smolenskoy-aes-2-postavleny-pervye-moduli-transformatornoy-podstantsii-/"],"updatedAt":"2026-10-25T11:43:00Z","items":[{"label":{"tr":"Başlatılan ekipman lotları","en":"Equipment lots launched"},"value":38,"unit":"lots","period":"2026-10-22","basis":"observed"},{"label":{"tr":"Lotlardaki ekipman adedi","en":"Equipment items in lots"},"value":5332,"unit":"items","period":"2026-10-22","basis":"observed"},{"label":{"tr":"Planlanan iki ünitenin toplam kurulu gücü","en":"Planned combined installed capacity of two units"},"value":2400,"unit":"MW","period":"2026","basis":"target"}]}}
