{"version":"1","article":{"id":"saipem-aduro-chemelot-kimyasal-geri-donusum-2026","slug":"saipem-supports-aduros-dutch-recycling-plant-preparation","language":"en","url":"https://haberpaper.com/en/news/saipem-supports-aduros-dutch-recycling-plant-preparation","api_url":"https://haberpaper.com/api/v1/articles/saipem-supports-aduros-dutch-recycling-plant-preparation?lang=en","title":"Saipem supports Aduro’s Dutch recycling plant preparation","summary":"Chemelot work covers preliminary engineering and procurement services.","category":"energy","region":"world","topics":["epc-contractors"],"published_at":"2026-10-02T21:09:51+03:00","modified_at":"2026-10-02T21:09:51+03:00","publication_basis":"publication-record","event_period":"2026-08-19","event_period_basis":"event-or-reference-period","sources":[{"name":"Saipem","url":"https://www.saipem.com/en/media/news/saipem-selected-to-support-the-development-of-an-advanced-chemical-recycling-plant-in-the-netherlands","checkedAt":"2026-10-02","publishedAt":"2026-08-19"}],"translations":[{"language":"tr","url":"https://haberpaper.com/tr/news/saipem-supports-aduros-dutch-recycling-plant-preparation","api_url":"https://haberpaper.com/api/v1/articles/saipem-supports-aduros-dutch-recycling-plant-preparation?lang=tr"},{"language":"en","url":"https://haberpaper.com/en/news/saipem-supports-aduros-dutch-recycling-plant-preparation","api_url":"https://haberpaper.com/api/v1/articles/saipem-supports-aduros-dutch-recycling-plant-preparation?lang=en"},{"language":"ar","url":"https://haberpaper.com/ar/news/saipem-supports-aduros-dutch-recycling-plant-preparation","api_url":"https://haberpaper.com/api/v1/articles/saipem-supports-aduros-dutch-recycling-plant-preparation?lang=ar"}],"data_types":[],"data":null,"data_compilations":[],"data_downloads":[],"content":{"paragraphs":["Saipem announced its selection for Aduro’s first industrial facility at Chemelot on August 19. The plastic-to-chemical-feedstock plan has an initial 10,000-tonne annual capacity.","The announcement concerns preliminary services; later construction is a separate stage. Technical assessment should connect waste variability, product acceptance requirements and operating capacity. Scaling a pilot technology does not itself establish the start of commercial production."],"key_points":[],"sections":[]},"text":"Chemelot work covers preliminary engineering and procurement services.\n\nSaipem announced its selection for Aduro’s first industrial facility at Chemelot on August 19. The plastic-to-chemical-feedstock plan has an initial 10,000-tonne annual capacity.\n\nThe announcement concerns preliminary services; later construction is a separate stage. Technical assessment should connect waste variability, product acceptance requirements and operating capacity. Scaling a pilot technology does not itself establish the start of commercial production.","corrections":[],"editorial_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"},"section_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"}}}
