{"version":"1","article":{"id":"saipem-bouri-libya-gaz-modulu-kaldirma-2026","slug":"saipem-7000-completes-bouri-gas-module-lift-in-libya","language":"en","url":"https://haberpaper.com/en/news/saipem-7000-completes-bouri-gas-module-lift-in-libya","api_url":"https://haberpaper.com/api/v1/articles/saipem-7000-completes-bouri-gas-module-lift-in-libya?lang=en","title":"Saipem 7000 completes Bouri gas-module lift in Libya","summary":"Site integration follows within the existing EPCI project.","category":"energy","region":"world","topics":["epc-contractors"],"published_at":"2026-10-02T21:09:51+03:00","modified_at":"2026-10-02T21:09:51+03:00","publication_basis":"publication-record","event_period":"2026-06-03","event_period_basis":"event-or-reference-period","sources":[{"name":"Saipem","url":"https://www.saipem.com/en/media/news/Saipem-7000-successfully-completes-the-lifting-of-the-gas-treatment-module-for-the-Bouri-project-in-Libya","checkedAt":"2026-10-02","publishedAt":"2026-06-03"}],"translations":[{"language":"tr","url":"https://haberpaper.com/tr/news/saipem-7000-completes-bouri-gas-module-lift-in-libya","api_url":"https://haberpaper.com/api/v1/articles/saipem-7000-completes-bouri-gas-module-lift-in-libya?lang=tr"},{"language":"en","url":"https://haberpaper.com/en/news/saipem-7000-completes-bouri-gas-module-lift-in-libya","api_url":"https://haberpaper.com/api/v1/articles/saipem-7000-completes-bouri-gas-module-lift-in-libya?lang=en"},{"language":"ar","url":"https://haberpaper.com/ar/news/saipem-7000-completes-bouri-gas-module-lift-in-libya","api_url":"https://haberpaper.com/api/v1/articles/saipem-7000-completes-bouri-gas-module-lift-in-libya?lang=ar"}],"data_types":[],"data":null,"data_compilations":[],"data_downloads":[],"content":{"paragraphs":["Saipem said on June 3 that it lifted the Bouri gas-recovery module onto an existing offshore platform. The Rosetti Marino-built module weighs more than 5,200 tonnes.","The milestone does not establish gas production start-up. Post-lift review needs separate acceptance records for hook-up, safety systems and commissioning. Placing heavy equipment and verifying operational performance are different delivery steps."],"key_points":[],"sections":[]},"text":"Site integration follows within the existing EPCI project.\n\nSaipem said on June 3 that it lifted the Bouri gas-recovery module onto an existing offshore platform. The Rosetti Marino-built module weighs more than 5,200 tonnes.\n\nThe milestone does not establish gas production start-up. Post-lift review needs separate acceptance records for hook-up, safety systems and commissioning. Placing heavy equipment and verifying operational performance are different delivery steps.","corrections":[],"editorial_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"},"section_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"}}}
