{"version":"1","article":{"id":"russia-rostec-solid-oxide-fuel-cell-power-units","slug":"russia-rostec-solid-oxide-fuel-cell-power-units","language":"en","url":"https://haberpaper.com/en/news/russia-rostec-solid-oxide-fuel-cell-power-units","api_url":"https://haberpaper.com/api/v1/articles/russia-rostec-solid-oxide-fuel-cell-power-units?lang=en","title":"Rostec outlines solid-oxide fuel-cell power systems under development","summary":"UEC is developing 2.5 kW and 20 kW systems for remote communities and data centres.","category":"energy","region":"world","topics":["oil-gas","electrical-materials"],"published_at":"2026-10-10T18:32:52+03:00","modified_at":"2026-10-10T18:32:52+03:00","publication_basis":"publication-record","event_period":"2026-09","event_period_basis":"source-review","sources":[{"name":"Rostec State Corporation","url":"https://rostec.ru/media/news/odk-sozdaet-lineyku-innovatsionnykh-energeticheskikh-ustanovok-na-tverdooksidnykh-toplivnykh-element/","publishedAt":"2026-10-01","checkedAt":"2026-10-10"}],"translations":[{"language":"tr","url":"https://haberpaper.com/tr/news/russia-rostec-solid-oxide-fuel-cell-power-units","api_url":"https://haberpaper.com/api/v1/articles/russia-rostec-solid-oxide-fuel-cell-power-units?lang=tr"},{"language":"en","url":"https://haberpaper.com/en/news/russia-rostec-solid-oxide-fuel-cell-power-units","api_url":"https://haberpaper.com/api/v1/articles/russia-rostec-solid-oxide-fuel-cell-power-units?lang=en"},{"language":"ar","url":"https://haberpaper.com/ar/news/russia-rostec-solid-oxide-fuel-cell-power-units","api_url":"https://haberpaper.com/api/v1/articles/russia-rostec-solid-oxide-fuel-cell-power-units?lang=ar"},{"language":"fr","url":"https://haberpaper.com/fr/news/russia-rostec-solid-oxide-fuel-cell-power-units","api_url":"https://haberpaper.com/api/v1/articles/russia-rostec-solid-oxide-fuel-cell-power-units?lang=fr"},{"language":"es","url":"https://haberpaper.com/es/news/russia-rostec-solid-oxide-fuel-cell-power-units","api_url":"https://haberpaper.com/api/v1/articles/russia-rostec-solid-oxide-fuel-cell-power-units?lang=es"}],"data_types":[],"data":null,"data_compilations":[],"data_downloads":[],"content":{"paragraphs":["Rostec’s United Engine Corporation (UEC) said on October 1 that it is developing solid-oxide fuel-cell power systems in 2.5 kW and 20 kW classes. The company displayed a model at the Moscow Startup Summit, held on September 29–30. UEC says the 2.5 kW unit is being developed and tested in laboratory conditions; it plans to complete development of the 20 kW system in early 2027 and then begin pilot industrial trials in conditions close to real operation.","The systems are intended to provide power to remote communities, data centres and housing and utility facilities. The company describes a modular design and possible use at remote sites that run on liquefied natural gas, propane or associated petroleum gas; planned maintenance intervals exceed 8,000 hours and the design service life is 30 years. These are company specifications and targets. The announcement does not report commercial deliveries, field performance, measured emissions or installed capacity."],"key_points":[],"sections":[]},"text":"UEC is developing 2.5 kW and 20 kW systems for remote communities and data centres.\n\nRostec’s United Engine Corporation (UEC) said on October 1 that it is developing solid-oxide fuel-cell power systems in 2.5 kW and 20 kW classes. The company displayed a model at the Moscow Startup Summit, held on September 29–30. UEC says the 2.5 kW unit is being developed and tested in laboratory conditions; it plans to complete development of the 20 kW system in early 2027 and then begin pilot industrial trials in conditions close to real operation.\n\nThe systems are intended to provide power to remote communities, data centres and housing and utility facilities. The company describes a modular design and possible use at remote sites that run on liquefied natural gas, propane or associated petroleum gas; planned maintenance intervals exceed 8,000 hours and the design service life is 30 years. These are company specifications and targets. The announcement does not report commercial deliveries, field performance, measured emissions or installed capacity.","corrections":[],"editorial_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"},"section_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"}}}
