{"version":1,"article_url":"https://haberpaper.com/es/news/nigeria-ogun-port-hinterland-analysis-2026","compilation":{"creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null},"block":{"id":"technical-baseline","type":"metrics","title":{"tr":"Açıklanan proje ölçeği","en":"Announced project scale","ar":"حجم المشروع المعلن","fr":"Échelle annoncée du projet","es":"Escala anunciada del proyecto"},"description":{"tr":"Mutabakat aşamasındaki öneri ve planlar; tamamlanmış işletme kapasitesi değildir.","en":"Proposals and plans at memorandum stage; not completed operating capacity.","ar":"مقترحات وخطط في مرحلة المذكرات وليست طاقة تشغيل مكتملة.","fr":"Propositions au stade mémorandum, pas capacité opérationnelle achevée.","es":"Propuestas en fase de memorando, no capacidad operativa terminada."},"methodology":{"tr":"24 Eylül duyurusundaki önerilen arazi ve planlanan erişim uzunluğu; gün duyuru tarihidir, teslim tarihi değildir. 28/700×100=%4 yalnız uzunluk payıdır.","en":"Proposed land and planned access length in the 24 September announcement; day is announcement date, not delivery date. 28/700×100=4% is only a length share.","ar":"الأرض المقترحة وطول الوصول المخطط في إعلان 24 سبتمبر؛ اليوم تاريخ إعلان لا تسليم. 28/700×100=4% حصة طول فقط.","fr":"Terrain proposé et accès prévu annoncés le 24 septembre ; date d’annonce, pas livraison. 28/700×100=4% mesure uniquement une part de longueur.","es":"Terreno propuesto y longitud de acceso prevista el 24 de septiembre; fecha de anuncio, no entrega. 28/700×100=4% es sólo cuota de longitud."},"sourceUrls":["https://statehouse.gov.ng/in-paris-as-ogun-state-dp-world-sign-mou-on-deep-sea-port-president-tinubu-assures-investors-of-regulatory-clarity/"],"updatedAt":"2026-10-07T00:52:03+03:00","items":[{"label":{"tr":"Önerilen sanayi bölgesi","en":"Proposed industrial zone","ar":"المنطقة الصناعية المقترحة","fr":"Zone industrielle proposée","es":"Zona industrial propuesta"},"value":10000,"unit":"hectares","period":"2026-09-24","basis":"target","measure":{"id":"ogun-blue-marine-zone-proposed-area","unitCode":"hectare","geography":"nigeria-ogun","frequency":"irregular","aggregation":"stock","periodRole":"announcement-date"}},{"label":{"tr":"Planlanan Ogun erişim bölümü","en":"Planned Ogun access section","ar":"مقطع الوصول المخطط في أوغون","fr":"Tronçon d’accès prévu Ogun","es":"Tramo de acceso previsto Ogun"},"value":28,"unit":"kilometres","period":"2026-09-24","basis":"target","measure":{"id":"ogun-coastal-highway-planned-section-length","unitCode":"kilometre","geography":"nigeria-ogun","frequency":"irregular","aggregation":"stock","periodRole":"announcement-date"}},{"label":{"tr":"Planlanan kıyı koridoru","en":"Planned coastal corridor","ar":"الممر الساحلي المخطط","fr":"Corridor côtier prévu","es":"Corredor costero previsto"},"value":700,"unit":"kilometres","period":"2026-09-24","basis":"target","measure":{"id":"lagos-calabar-coastal-highway-planned-length","unitCode":"kilometre","geography":"nigeria","frequency":"irregular","aggregation":"stock","periodRole":"announcement-date"}}]}}
