{"version":1,"article_url":"https://haberpaper.com/ar/news/malaysia-glics-to-invest-additional-rm120-billion-through-2028","compilation":{"creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null},"block":{"id":"gearup-multiyear-target","type":"metrics","title":{"tr":"GEAR-uP çok yıllı yatırım hedefi","en":"GEAR-uP multi-year investment target","ar":"الهدف الاستثماري متعدد السنوات لبرنامج GEAR-uP","fr":"Objectif pluriannuel d’investissement de GEAR-uP","es":"Objetivo plurianual de inversión de GEAR-uP"},"description":{"tr":"İlk aşama için ilan edilen yurt içi doğrudan yatırım taahhüdü.","en":"Announced domestic direct-investment commitment for the programme’s first phase.","ar":"التزام الاستثمار المباشر المحلي المعلن للمرحلة الأولى.","fr":"Engagement annoncé d’investissement direct intérieur pour la première phase du programme.","es":"Compromiso anunciado de inversión directa nacional para la primera fase del programa."},"methodology":{"tr":"120 milyar MYR, 2024–2028 için kümülatif hedef olarak gösterilir; gerçekleşmiş toplam değildir. Kaynak 2026’da 2025’e benzer yatırım düzeyi beklendiğini bildirir, ancak bu beklentiyi kesin sayıya dönüştürmez.","en":"MYR 120 billion is shown as a cumulative 2024–2028 target, not a realised total. The source reports an expectation of a similar investment level in 2026, but does not turn that expectation into an exact value.","ar":"يُعرض مبلغ 120 مليار MYR كهدف تراكمي للفترة 2024–2028، وليس إجمالياً محققاً. ويتوقع المصدر في 2026 مستوى استثمار مشابهاً لـ2025، لكنه لا يحدد هذه التوقعات برقم دقيق.","fr":"Les 120 milliards de MYR sont présentés comme un objectif cumulé pour 2024–2028, et non comme un total réalisé. La source prévoit un niveau similaire à 2025 en 2026, sans chiffrer précisément cette attente.","es":"Los 120.000 millones de MYR se presentan como objetivo acumulado para 2024–2028, no como total realizado. La fuente espera un nivel similar al de 2025 en 2026, pero no cuantifica exactamente esa previsión."},"sourceUrls":["https://www.bernama.com/en/news.php?id=2613202","https://www.mof.gov.my/portal/en/news/press-release/gear-up-2026-report-card-07082026"],"updatedAt":"2026-10-04T14:38:42Z","items":[{"label":{"tr":"2024–2028 GEAR-uP yurt içi doğrudan yatırım taahhüdü","en":"GEAR-uP domestic direct-investment commitment, 2024–2028","ar":"التزام GEAR-uP بالاستثمار المباشر المحلي للفترة 2024–2028","fr":"Engagement d’investissement direct intérieur de GEAR-uP, 2024–2028","es":"Compromiso de inversión directa nacional de GEAR-uP, 2024–2028"},"value":120,"unit":"billion MYR","period":"2028","periodStart":"2024","basis":"target","measure":{"id":"gearup-domestic-investment-commitment","unitCode":"billion-myr","geography":"malaysia-gearup","frequency":"annual","aggregation":"cumulative","periodRole":"reference-period"}}]}}
