{"version":"1","article":{"id":"lamprell-jebel-ali-uretim-epci-temmuz-2026","slug":"lamprell-reports-jebel-alis-return-to-production","language":"en","url":"https://haberpaper.com/en/news/lamprell-reports-jebel-alis-return-to-production","api_url":"https://haberpaper.com/api/v1/articles/lamprell-reports-jebel-alis-return-to-production?lang=en","title":"Lamprell reports Jebel Ali’s return to production","summary":"July operational update concerns ongoing EPCI programmes.","category":"energy","region":"world","topics":["epc-contractors"],"published_at":"2026-10-02T21:09:51+03:00","modified_at":"2026-10-02T21:09:51+03:00","publication_basis":"publication-record","event_period":"2026-07","event_period_basis":"event-or-reference-period","sources":[{"name":"Lamprell","url":"https://www.lamprell.com/lamprelltimes-q2-2026/lt2026q2-business-as-usual-delivering-across-multiple-fronts/","checkedAt":"2026-10-02"}],"translations":[{"language":"tr","url":"https://haberpaper.com/tr/news/lamprell-reports-jebel-alis-return-to-production","api_url":"https://haberpaper.com/api/v1/articles/lamprell-reports-jebel-alis-return-to-production?lang=tr"},{"language":"en","url":"https://haberpaper.com/en/news/lamprell-reports-jebel-alis-return-to-production","api_url":"https://haberpaper.com/api/v1/articles/lamprell-reports-jebel-alis-return-to-production?lang=en"},{"language":"ar","url":"https://haberpaper.com/ar/news/lamprell-reports-jebel-alis-return-to-production","api_url":"https://haberpaper.com/api/v1/articles/lamprell-reports-jebel-alis-return-to-production?lang=ar"}],"data_types":[],"data":null,"data_compilations":[],"data_downloads":[],"content":{"paragraphs":["Lamprell’s July 2026 bulletin reports that Dubai’s Jebel Ali facility returned to production. More than 90% of purchase orders have been placed for existing Aramco LTA projects.","This is an operating update rather than a new award. Material arrival is a separate delivery stage from ordering, while final project completion needs independent confirmation."],"key_points":[],"sections":[]},"text":"July operational update concerns ongoing EPCI programmes.\n\nLamprell’s July 2026 bulletin reports that Dubai’s Jebel Ali facility returned to production. More than 90% of purchase orders have been placed for existing Aramco LTA projects.\n\nThis is an operating update rather than a new award. Material arrival is a separate delivery stage from ordering, while final project completion needs independent confirmation.","corrections":[],"editorial_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"},"section_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"}}}
