{"version":1,"article_url":"https://haberpaper.com/en/news/kuwait-dibdibah-shagaya-solar-consortium-selection-2026","compilation":{"creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null},"block":{"id":"planned-solar-project-capacity","type":"metrics","title":{"tr":"Dibdibah-Şagaya Zone One planlanan kapasitesi","en":"Dibdibah–Shagaya Zone One planned capacity","ar":"القدرة المخططة لمشروع الدبدبة–الشقايا المنطقة الأولى","fr":"Capacité prévue du projet Dibdibah–Shagaya Zone One","es":"Capacidad prevista del proyecto Dibdibah–Shagaya Zone One"},"description":{"tr":"GLA'nın 4 Ekim açıklamasında konsorsiyuma ilişkin bildirilen proje tasarım parametresi.","en":"Project design parameter reported in GLA's 4 October statement about the consortium.","ar":"معلمة تصميم للمشروع وردت في بيان غلا بتاريخ 4 أكتوبر عن التحالف.","fr":"Paramètre de conception rapporté dans la déclaration de GLA du 4 octobre sur le consortium.","es":"Parámetro de diseño comunicado en la declaración de GLA del 4 de octubre sobre el consorcio."},"methodology":{"tr":"1,1 GW planlanan güçtür; işletmedeki üretim veya yıllık elektrik miktarı değildir. Seçim bilgisi GLA'nın müşteri tarafı açıklamasına dayalıdır.","en":"1.1 GW is planned capacity, not operating generation or annual electricity output. The selection account is attributed to GLA's client-side announcement.","ar":"1.1 غيغاواط قدرة مخططة، وليست توليداً تشغيلياً أو كمية كهرباء سنوية. ونُسبت رواية الاختيار إلى إعلان غلا من جانب مستشار التحالف.","fr":"1,1 GW est une capacité prévue, pas une production en exploitation ou annuelle. La sélection est attribuée à l’annonce de GLA, conseil du consortium.","es":"1,1 GW es capacidad prevista, no generación operativa ni producción anual. La selección se atribuye al anuncio de GLA, asesor del consorcio."},"sourceUrls":["https://www.glaco.com/blog/gla-co-advises-masdar-and-fouad-alghanim-sons-consortium-on-kuwaits-landmark-1-1gw-al-dibdibah-and-al-shagaya-ppp-project/"],"updatedAt":"2026-10-08T20:49:41+00:00","items":[{"label":{"tr":"Planlanan elektrik üretim kapasitesi","en":"Planned electricity generation capacity","ar":"قدرة توليد الكهرباء المخططة","fr":"Capacité de production électrique prévue","es":"Capacidad prevista de generación eléctrica"},"value":1.1,"unit":"GW","period":"2026-10-04","basis":"target","measure":{"id":"kuwait-dibdibah-shagaya-zone-one-planned-capacity","unitCode":"gw","geography":"kuwait","frequency":"irregular","aggregation":"unspecified","periodRole":"announcement-date"}}]}}
