{"version":"1","article":{"id":"jordan-southern-municipal-solar-program-2026","slug":"jordan-southern-municipal-solar-program-2026","language":"en","url":"https://haberpaper.com/en/news/jordan-southern-municipal-solar-program-2026","api_url":"https://haberpaper.com/api/v1/articles/jordan-southern-municipal-solar-program-2026?lang=en","title":"Jordan launches solar phase for southern municipalities","summary":"The new phase covers 18 municipal buildings; the 3.4 MW capacity and annual savings estimates apply to the nationwide programme.","category":"energy","region":"world","topics":[],"published_at":"2026-10-08T23:31:12+03:00","modified_at":"2026-10-08T23:31:12+03:00","publication_basis":"publication-record","event_period":"2026-09-07","event_period_basis":"event-or-reference-period","sources":[{"name":"Petra, Jordan News Agency","url":"https://petra.gov.jo/lne/index.php/en/news/energy-fund-launches-solar-project-for-southern-municipalities","publishedAt":"2026-09-07","checkedAt":"2026-10-08"}],"translations":[{"language":"tr","url":"https://haberpaper.com/tr/news/jordan-southern-municipal-solar-program-2026","api_url":"https://haberpaper.com/api/v1/articles/jordan-southern-municipal-solar-program-2026?lang=tr"},{"language":"en","url":"https://haberpaper.com/en/news/jordan-southern-municipal-solar-program-2026","api_url":"https://haberpaper.com/api/v1/articles/jordan-southern-municipal-solar-program-2026?lang=en"},{"language":"ar","url":"https://haberpaper.com/ar/news/jordan-southern-municipal-solar-program-2026","api_url":"https://haberpaper.com/api/v1/articles/jordan-southern-municipal-solar-program-2026?lang=ar"},{"language":"fr","url":"https://haberpaper.com/fr/news/jordan-southern-municipal-solar-program-2026","api_url":"https://haberpaper.com/api/v1/articles/jordan-southern-municipal-solar-program-2026?lang=fr"},{"language":"es","url":"https://haberpaper.com/es/news/jordan-southern-municipal-solar-program-2026","api_url":"https://haberpaper.com/api/v1/articles/jordan-southern-municipal-solar-program-2026?lang=es"}],"data_types":["table"],"data":{"version":1,"blocks":[{"id":"municipal-solar-program-scope","type":"table","title":{"tr":"Ürdün belediye güneş programı: aşama ve ülke geneli","en":"Jordan municipal solar programme: phase and national scope","ar":"برنامج الطاقة الشمسية للبلديات الأردنية: المرحلة والنطاق الوطني","fr":"Programme solaire municipal jordanien : phase et portée nationale","es":"Programa solar municipal de Jordania: fase y alcance nacional"},"description":{"tr":"18 güney binası yeni aşamadır; diğer kapasite ve yıllık etki göstergeleri ülke programının tamamına aittir.","en":"The 18 southern buildings are the new phase; other capacity and annual-impact indicators apply to the full national programme.","ar":"المباني الجنوبية الثمانية عشر هي المرحلة الجديدة؛ أما مؤشرات القدرة والأثر السنوي الأخرى فتخص البرنامج الوطني كاملاً.","fr":"Les 18 bâtiments du Sud constituent la nouvelle phase ; les autres indicateurs de capacité et d’impact annuel concernent tout le programme national.","es":"Los 18 edificios del sur son la nueva fase; los demás indicadores de capacidad e impacto anual corresponden al programa nacional completo."},"methodology":{"tr":"18 bina 7 Eylül’de başlatılan güney aşamasına aittir. Diğer sayılar 104 belediyelik ulusal program içindir. Yaklaşık, beklenen ve '550’den fazla' nitelemeleri kaynakta aktarıldığı biçimde tabloda korunur. Kaynağın 'tons' ifadesi birim dönüştürülmeden tutulmuştur.","en":"The 18 buildings belong to the southern phase launched on 7 September. Other figures describe the national programme across 104 municipalities. Approximate, expected and 'more than 550' qualifiers are retained. The source's word 'tons' is preserved without unit conversion.","ar":"تخص المباني الثمانية عشر المرحلة الجنوبية التي أُطلقت في 7 سبتمبر. أما الأرقام الأخرى فتصف البرنامج الوطني في 104 بلديات. وأُبقيت أوصاف التقريب والتوقع و«أكثر من 550» كما وردت. وحُفظت كلمة المصدر للطن دون تحويل للوحدة.","fr":"Les 18 bâtiments relèvent de la phase sud lancée le 7 septembre. Les autres chiffres décrivent le programme national dans 104 municipalités. Les qualificatifs approximatif, attendu et « plus de 550 » sont conservés. Le terme source « tons » est maintenu sans conversion d’unité.","es":"Los 18 edificios pertenecen a la fase sur lanzada el 7 de septiembre. Las demás cifras describen el programa nacional en 104 municipios. Se conservan los calificativos aproximado, previsto y «más de 550». Se mantiene 'tons' según la fuente, sin conversión de unidad."},"sourceUrls":["https://petra.gov.jo/lne/index.php/en/news/energy-fund-launches-solar-project-for-southern-municipalities"],"updatedAt":"2026-10-08T20:17:16+00:00","columns":[{"key":"indicator","label":{"tr":"Gösterge","en":"Indicator","ar":"المؤشر","fr":"Indicateur","es":"Indicador"},"type":"text","language":"en"},{"key":"value","label":{"tr":"Değer","en":"Value","ar":"القيمة","fr":"Valeur","es":"Valor"},"type":"number"},{"key":"unit","label":{"tr":"Birim","en":"Unit","ar":"الوحدة","fr":"Unité","es":"Unidad"},"type":"text","language":"en"},{"key":"scope","label":{"tr":"Kapsam ve niteleme","en":"Scope and qualifier","ar":"النطاق والوصف","fr":"Portée et précision","es":"Alcance y calificador"},"type":"text","language":"en"}],"rows":[{"indicator":"Southern phase municipal buildings","value":18,"unit":"buildings","scope":"Launched phase; exact count"},{"indicator":"Municipalities in national programme","value":104,"unit":"municipalities","scope":"Full national programme"},{"indicator":"Municipal buildings in national programme","value":188,"unit":"buildings","scope":"Full national programme"},{"indicator":"Combined installed solar capacity","value":3.4,"unit":"MW","scope":"About; full national programme"},{"indicator":"Annual electricity-cost savings","value":550000,"unit":"JOD per year","scope":"About; expected for full national programme"},{"indicator":"Annual CO2 emissions reduction","value":3838,"unit":"tons of CO2 per year (source wording)","scope":"About; expected for full national programme"},{"indicator":"Municipal staff training target","value":550,"unit":"people","scope":"More than 550; two training packages across programme"}]}]},"data_compilations":[{"id":"municipal-solar-program-scope","creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null}],"data_downloads":[{"id":"municipal-solar-program-scope","formats":{"json":"https://haberpaper.com/api/v1/articles/jordan-southern-municipal-solar-program-2026/data/municipal-solar-program-scope?lang=en&format=json","csv":"https://haberpaper.com/api/v1/articles/jordan-southern-municipal-solar-program-2026/data/municipal-solar-program-scope?lang=en&format=csv"}}],"content":{"paragraphs":["Jordan’s Renewable Energy and Energy Efficiency Fund (JREEEF) launched on 7 September 2026 a project to install solar-cell systems on 18 municipal buildings in the country’s southern region. Jordan’s Petra News Agency reported that this phase followed completion of similar work in northern municipalities. The report did not state the capacity, cost or installation schedule for the 18 buildings individually, so nationwide programme figures should not be attributed to the southern phase alone.","Petra described the southern launch as part of a broader national programme. That programme covers solar systems at 188 municipal buildings across 104 municipalities and has a combined capacity of about 3.4 megawatts. These measures describe the programme as a whole, separately from the newly launched southern phase. The report did not state the exact share of the 188 buildings represented by the 18 southern sites, the capacity at each building or the investment cost of this phase.","The agency said the nationwide programme is expected to save about JD550,000 a year in electricity costs and reduce carbon-dioxide emissions by about 3,838 tons a year. The source frames these as expected annual outcomes, not measured results. They refer to the programme across 104 municipalities and should not be presented as the expected result for only the 18 southern buildings. The report does not give a start year for the estimates or describe the calculation method.","The programme also plans to train more than 550 municipal staff through two training packages. Petra said the training is intended to help staff operate and manage the systems. “More than 550” is a lower bound, not an exact count of graduates. Because the training target applies to the overall programme, the report does not support calculating how many people will train in the southern phase or estimating a separate employment effect.","Ministry representatives said installations in the earlier northern phase helped reduce operating costs and electricity bills. The report, however, provides no comparison period, billing data or percentage saving. The comment is therefore a qualitative description of the earlier phase. The extent to which the southern installations produce similar results can be measured after systems are installed and operating; those measurements were not included in the launch announcement.","Petra placed the project within the government’s effort to extend renewable-energy programmes across Jordan and a partnership with Italy’s Ministry of Environment and Energy Security (MASE). The agency described support for clean-energy projects, emissions reduction and municipal staff training as elements of that cooperation. It did not publish funding shares, a contract value or a division of responsibilities between partners. The data table keeps the 18-building launch separate from programme-wide targets and estimates."],"key_points":[],"sections":[]},"text":"The new phase covers 18 municipal buildings; the 3.4 MW capacity and annual savings estimates apply to the nationwide programme.\n\nJordan’s Renewable Energy and Energy Efficiency Fund (JREEEF) launched on 7 September 2026 a project to install solar-cell systems on 18 municipal buildings in the country’s southern region. Jordan’s Petra News Agency reported that this phase followed completion of similar work in northern municipalities. The report did not state the capacity, cost or installation schedule for the 18 buildings individually, so nationwide programme figures should not be attributed to the southern phase alone.\n\nPetra described the southern launch as part of a broader national programme. That programme covers solar systems at 188 municipal buildings across 104 municipalities and has a combined capacity of about 3.4 megawatts. These measures describe the programme as a whole, separately from the newly launched southern phase. The report did not state the exact share of the 188 buildings represented by the 18 southern sites, the capacity at each building or the investment cost of this phase.\n\nThe agency said the nationwide programme is expected to save about JD550,000 a year in electricity costs and reduce carbon-dioxide emissions by about 3,838 tons a year. The source frames these as expected annual outcomes, not measured results. They refer to the programme across 104 municipalities and should not be presented as the expected result for only the 18 southern buildings. The report does not give a start year for the estimates or describe the calculation method.\n\nThe programme also plans to train more than 550 municipal staff through two training packages. Petra said the training is intended to help staff operate and manage the systems. “More than 550” is a lower bound, not an exact count of graduates. Because the training target applies to the overall programme, the report does not support calculating how many people will train in the southern phase or estimating a separate employment effect.\n\nMinistry representatives said installations in the earlier northern phase helped reduce operating costs and electricity bills. The report, however, provides no comparison period, billing data or percentage saving. The comment is therefore a qualitative description of the earlier phase. The extent to which the southern installations produce similar results can be measured after systems are installed and operating; those measurements were not included in the launch announcement.\n\nPetra placed the project within the government’s effort to extend renewable-energy programmes across Jordan and a partnership with Italy’s Ministry of Environment and Energy Security (MASE). The agency described support for clean-energy projects, emissions reduction and municipal staff training as elements of that cooperation. It did not publish funding shares, a contract value or a division of responsibilities between partners. The data table keeps the 18-building launch separate from programme-wide targets and estimates.","corrections":[],"editorial_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"},"section_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"}}}
