{"version":1,"article_url":"https://haberpaper.com/en/news/jordan-aqaba-green-hydrogen-feasibility-study-mou-2026","compilation":{"creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null},"block":{"id":"proposed-project-study-scope","type":"table","title":{"tr":"Akabe yeşil hidrojen çalışmasının kapsamı","en":"Scope of the Aqaba green hydrogen study","ar":"نطاق دراسة الهيدروجين الأخضر في العقبة","fr":"Périmètre de l’étude sur l’hydrogène vert à Aqaba","es":"Alcance del estudio de hidrógeno verde en Aqaba"},"description":{"tr":"Bakanlığın 14 Eylül mutabakatında inceleme kapsamına aldığı öneri bileşenleri; proje taahhüdü veya mevcut tesisler değildir.","en":"Proposed components included in the ministry's 14 September memorandum study scope; these are not project commitments or existing facilities.","ar":"العناصر المقترحة التي شملها نطاق دراسة مذكرة الوزارة في 14 سبتمبر؛ وليست التزامات تنفيذية أو منشآت قائمة.","fr":"Composantes proposées dans le périmètre d’étude du protocole ministériel du 14 septembre ; il ne s’agit ni d’engagements de projet ni d’installations existantes.","es":"Componentes propuestos incluidos en el alcance del estudio del memorando ministerial del 14 de septiembre; no son compromisos ni instalaciones existentes."},"methodology":{"tr":"Resmî bakanlık duyurusunda sıralanan teknik ve ekonomik inceleme başlıkları derlenmiştir. Kapasite, bütçe, arazi seçimi ve uygulama takvimi açıklanmadığından eklenmemiştir.","en":"Components are transcribed as study topics in the ministry's official announcement. Capacity, budget, site selection and implementation dates were not announced and are omitted.","ar":"جُمعت العناصر كما وردت بوصفها موضوعات للدراسة في إعلان الوزارة الرسمي. ولم تُضف القدرة أو الميزانية أو اختيار الموقع أو مواعيد التنفيذ لأنها لم تُعلن.","fr":"Les composantes reprennent les sujets d’étude de l’annonce officielle du ministère. La capacité, le budget, le choix du site et les dates de mise en œuvre, non annoncés, sont omis.","es":"Los componentes reproducen los temas de estudio del anuncio oficial del ministerio. Se omiten capacidad, presupuesto, selección del emplazamiento y fechas de ejecución, que no fueron anunciados."},"sourceUrls":["https://www.memr.gov.jo/AR//NewsDetails/2026091402"],"updatedAt":"2026-10-08T20:17:16+00:00","columns":[{"key":"component","label":{"tr":"Bileşen","en":"Study component","ar":"عنصر الدراسة","fr":"Composante étudiée","es":"Componente estudiado"},"type":"text","language":"en"},{"key":"scope","label":{"tr":"Duyurudaki kapsam","en":"Scope described in announcement","ar":"النطاق الوارد في الإعلان","fr":"Périmètre décrit dans l’annonce","es":"Alcance descrito en el anuncio"},"type":"text","language":"en"}],"rows":[{"component":"Renewable energy generation","scope":"Assess renewable electricity supply for the proposed value chain"},{"component":"Water desalination","scope":"Study desalinated-water supply in Aqaba"},{"component":"Green hydrogen and ammonia","scope":"Assess production of hydrogen and derivatives"},{"component":"Energy storage and electricity transmission","scope":"Assess storage and grid-transmission links"},{"component":"Logistics and port services","scope":"Assess logistics and port-service requirements"},{"component":"Site, land and impacts","scope":"Study a possible location near Aqaba Port, land needs, and technical, environmental and social aspects"}]}}
