{"version":1,"article_url":"https://haberpaper.com/en/news/humain-datavolt-nebius-oxagon-50mw-framework-2026","compilation":{"creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null},"block":{"id":"oxagon-nebius-planned-capacity","type":"metrics","title":{"tr":"Oxagon kampüsü: planlanan kapasite","en":"Oxagon campus: planned capacity"},"description":{"tr":"NEOM açıklaması, ilk 360 MW’lık planlı aşamada Nebius için 50 MW’a kadar ön kapasite tahsisi bildiriyor.","en":"NEOM says a preliminary allocation of up to 50MW for Nebius sits within a planned 360MW first phase."},"methodology":{"tr":"İki ayrı plan göstergesi: ilk aşama toplamı 360 MW (hedef); Nebius’a önerilen tahsis en çok 50 MW (hedef). İnşaatta olduğu açıklanan ilk 100 MW, 360 MW toplamına dahildir; MW, faaliyetteki IT kapasitesi veya tüketim ölçüsü değildir.","en":"Two distinct planning figures: 360MW for the first phase (target); up to 50MW contemplated for Nebius (target). The first 100MW said to be under construction is included in the 360MW total; MW is not a measure of operational IT capacity or consumption."},"sourceUrls":["https://www.neom.com/en-us/newsroom/International-Agreement-Strengthens-Data-Center-Capabilities"],"updatedAt":"2026-10-25T14:39:03+03:00","items":[{"label":{"tr":"Planlanan ilk aşama","en":"Planned first phase"},"value":360,"unit":"MW","period":"2026-10-21","basis":"target"},{"label":{"tr":"Nebius için önerilen tahsis üst sınırı","en":"Maximum proposed allocation for Nebius"},"value":50,"unit":"MW","period":"2026-10-21","basis":"target"}]}}
