{"version":"1","article":{"id":"afganistan-azizi-dabs-845-mw-elektrik-sozlesmeleri-2026","slug":"dabs-and-azizi-energy-sign-contracts-for-845-mw-in-afghanistan","language":"en","url":"https://haberpaper.com/en/news/dabs-and-azizi-energy-sign-contracts-for-845-mw-in-afghanistan","api_url":"https://haberpaper.com/api/v1/articles/dabs-and-azizi-energy-sign-contracts-for-845-mw-in-afghanistan?lang=en","title":"DABS and Azizi Energy sign contracts for 845 MW in Afghanistan","summary":"Five projects combine solar and coal-fired generation.","category":"energy","region":"world","topics":["epc-contractors"],"published_at":"2026-10-02T21:09:51+03:00","modified_at":"2026-10-02T21:09:51+03:00","publication_basis":"publication-record","event_period":"2026-02-11","event_period_basis":"event-or-reference-period","sources":[{"name":"Afghanistan Deputy PM for Economic Affairs","url":"https://dpmea.gov.af/index.php/1404-English-News-162","checkedAt":"2026-10-02","publishedAt":"2026-02-11"}],"translations":[{"language":"tr","url":"https://haberpaper.com/tr/news/dabs-and-azizi-energy-sign-contracts-for-845-mw-in-afghanistan","api_url":"https://haberpaper.com/api/v1/articles/dabs-and-azizi-energy-sign-contracts-for-845-mw-in-afghanistan?lang=tr"},{"language":"en","url":"https://haberpaper.com/en/news/dabs-and-azizi-energy-sign-contracts-for-845-mw-in-afghanistan","api_url":"https://haberpaper.com/api/v1/articles/dabs-and-azizi-energy-sign-contracts-for-845-mw-in-afghanistan?lang=en"},{"language":"ar","url":"https://haberpaper.com/ar/news/dabs-and-azizi-energy-sign-contracts-for-845-mw-in-afghanistan","api_url":"https://haberpaper.com/api/v1/articles/dabs-and-azizi-energy-sign-contracts-for-845-mw-in-afghanistan?lang=ar"}],"data_types":[],"data":null,"data_compilations":[],"data_downloads":[],"content":{"paragraphs":["A February 11 release reports DABS and Azizi Energy signing implementation-start contracts for five projects targeting 845 MW: 330 MW solar and 515 MW coal-fired capacity.","Approximately USD 463 million investment is planned. Announced completion targets are two years for solar and three for coal. Capacities represent planned generation rather than an existing operating fleet."],"key_points":[],"sections":[]},"text":"Five projects combine solar and coal-fired generation.\n\nA February 11 release reports DABS and Azizi Energy signing implementation-start contracts for five projects targeting 845 MW: 330 MW solar and 515 MW coal-fired capacity.\n\nApproximately USD 463 million investment is planned. Announced completion targets are two years for solar and three for coal. Capacities represent planned generation rather than an existing operating fleet.","corrections":[],"editorial_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"},"section_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"}}}
