{"version":1,"article_url":"https://haberpaper.com/fr/news/canada-power-metallic-nisk-preliminary-economic-assessment-2026","compilation":{"creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null},"block":{"id":"canada-power-metallic-nisk-preliminary-economic-assessm-facts","type":"table","title":{"tr":"Kapsam","en":"Study scope","ar":"نطاق الدراسة","fr":"Portée de l’étude","es":"Alcance del estudio"},"description":{"tr":"PEA için şirket tarafından açıklanan ana kilometre taşları.","en":"Company-announced milestones for the PEA.","ar":"المراحل الرئيسية للتقييم كما أعلنتها الشركة.","fr":"Étapes annoncées par l’entreprise pour la PEA.","es":"Hitos anunciados por la empresa para la PEA."},"methodology":{"tr":"Tarih ve tamamlanma hedefi şirket duyurusudur; gelecekteki planlar gerçekleşmiş sonuç değildir.","en":"Dates and completion target are company-announced; future plans are not completed outcomes.","ar":"التواريخ والموعد المستهدف تعلنهما الشركة؛ الخطط المستقبلية ليست نتائج منجزة.","fr":"Les dates et l’objectif d’achèvement sont annoncés par l’entreprise; les plans futurs ne sont pas des résultats réalisés.","es":"Las fechas y el objetivo de finalización son anunciados por la empresa; los planes futuros no son resultados consumados."},"sourceUrls":["https://www.powermetallic.com/power_metallic_commences_preliminary_economic_assessment_of_the_nisk_project/"],"updatedAt":"2026-10-08T00:49:46+03:00","columns":[{"key":"phase","label":{"tr":"Aşama","en":"Phase","ar":"المرحلة","fr":"Étape","es":"Fase"},"type":"text","language":"en"},{"key":"date","label":{"tr":"Tarih","en":"Date","ar":"التاريخ","fr":"Date","es":"Fecha"},"type":"text","language":"en"},{"key":"status","label":{"tr":"Durum","en":"Status","ar":"الحالة","fr":"Statut","es":"Estado"},"type":"text","language":"en"}],"rows":[{"phase":"Assessment completion target","date":"2027-H1","status":"Company target, not completed result"},{"phase":"Environmental first field season","date":"2026-05/2026-10","status":"Company-reported ongoing program"},{"phase":"Second environmental field season","date":"2027 summer","status":"Planned"}]}}
