{"version":"1","article":{"id":"brazil-ceee-d-tariff-review-proposal-2026","slug":"brazil-ceee-d-tariff-review-proposal-2026","language":"en","url":"https://haberpaper.com/en/news/brazil-ceee-d-tariff-review-proposal-2026","api_url":"https://haberpaper.com/api/v1/articles/brazil-ceee-d-tariff-review-proposal-2026?lang=en","title":"ANEEL opens CEEE-D tariff proposal averaging 22.31% to public comment","summary":"The October 5 proposal concerns 2.03 million consumer units; final rates have not been decided, and submissions are due October 9.","category":"energy","region":"world","topics":[],"published_at":"2026-10-06T18:57:01+03:00","modified_at":"2026-10-06T18:57:01+03:00","publication_basis":"publication-record","event_period":"2026-10-05","event_period_basis":"event-or-reference-period","sources":[{"name":"Brazilian Electricity Regulatory Agency (ANEEL)","url":"https://www.gov.br/aneel/pt-br/assuntos/noticias/2026-defeso-eleitoral/audiencia-publica-discutira-revisao-das-tarifas-da-ceee-d-em-porto-alegre-rs/","publishedAt":"2026-10-05","checkedAt":"2026-10-06"}],"translations":[{"language":"tr","url":"https://haberpaper.com/tr/news/brazil-ceee-d-tariff-review-proposal-2026","api_url":"https://haberpaper.com/api/v1/articles/brazil-ceee-d-tariff-review-proposal-2026?lang=tr"},{"language":"en","url":"https://haberpaper.com/en/news/brazil-ceee-d-tariff-review-proposal-2026","api_url":"https://haberpaper.com/api/v1/articles/brazil-ceee-d-tariff-review-proposal-2026?lang=en"},{"language":"ar","url":"https://haberpaper.com/ar/news/brazil-ceee-d-tariff-review-proposal-2026","api_url":"https://haberpaper.com/api/v1/articles/brazil-ceee-d-tariff-review-proposal-2026?lang=ar"},{"language":"fr","url":"https://haberpaper.com/fr/news/brazil-ceee-d-tariff-review-proposal-2026","api_url":"https://haberpaper.com/api/v1/articles/brazil-ceee-d-tariff-review-proposal-2026?lang=fr"},{"language":"es","url":"https://haberpaper.com/es/news/brazil-ceee-d-tariff-review-proposal-2026","api_url":"https://haberpaper.com/api/v1/articles/brazil-ceee-d-tariff-review-proposal-2026?lang=es"}],"data_types":[],"data":null,"data_compilations":[],"data_downloads":[],"content":{"paragraphs":["Brazil’s electricity regulator ANEEL published a proposal on October 5 for the periodic tariff review of Companhia Estadual de Distribuição de Energia Elétrica, or CEEE-D, which serves customers in Rio Grande do Sul. The distributor serves approximately 2.03 million consumer units. The proposal would take effect on November 22, 2026, but the rates had not been decided when the notice was issued; they remained subject to public consultation. Consumers and other interested parties can submit comments through Public Consultation 027/2026 until October 9.","ANEEL’s table proposes an average effect of 24.24% for regulated low-voltage consumers and 15.88% for high-voltage consumers, with an average effect of 22.31% across consumers. These are averages calculated for different customer classes. They do not mean that each customer’s bill would rise by the same percentage. The regulator will review the tariff structure and cost components before issuing a final decision. The proposed figures should therefore not be described as rates already in force.","The agency identified costs linked to an increase in the regulated asset base and the restoration of part of the tariff deferral made during the 2024 review among the factors with the greatest effect on the proposed indices. ANEEL associated both factors with the consequences of climate events that affected Rio Grande do Sul in 2024. The notice did not assign a separate percentage contribution to each item. The overall average is the regulator’s proposed outcome, rather than a set of individually stated effects that can simply be added together.","Public participation has two channels. A hearing, Public Hearing 007/2026, is scheduled in Porto Alegre for October 8, starting at 2:30 p.m.; registration opens at 2 p.m. Consumers and other participants can speak at the in-person session. Written contributions to Consultation 027/2026 may be sent through October 9 on tariff review, tariff structure and technical losses. The hearing and the written consultation are separate ways to provide input within the same regulatory process.","ANEEL’s notice sets out the proposed average effects, the distributor’s customer count, the cost factors cited and the participation timetable. A final decision may reflect the regulator’s analysis by customer class as well as submissions received during consultation. The notice does not calculate the effect of a possible final increase on each household or business; that would depend on the customer’s voltage class, consumption profile and approved tariff. This account reports a proposal open for comment and keeps the draft rates distinct from prices currently in force."],"key_points":[],"sections":[]},"text":"The October 5 proposal concerns 2.03 million consumer units; final rates have not been decided, and submissions are due October 9.\n\nBrazil’s electricity regulator ANEEL published a proposal on October 5 for the periodic tariff review of Companhia Estadual de Distribuição de Energia Elétrica, or CEEE-D, which serves customers in Rio Grande do Sul. The distributor serves approximately 2.03 million consumer units. The proposal would take effect on November 22, 2026, but the rates had not been decided when the notice was issued; they remained subject to public consultation. Consumers and other interested parties can submit comments through Public Consultation 027/2026 until October 9.\n\nANEEL’s table proposes an average effect of 24.24% for regulated low-voltage consumers and 15.88% for high-voltage consumers, with an average effect of 22.31% across consumers. These are averages calculated for different customer classes. They do not mean that each customer’s bill would rise by the same percentage. The regulator will review the tariff structure and cost components before issuing a final decision. The proposed figures should therefore not be described as rates already in force.\n\nThe agency identified costs linked to an increase in the regulated asset base and the restoration of part of the tariff deferral made during the 2024 review among the factors with the greatest effect on the proposed indices. ANEEL associated both factors with the consequences of climate events that affected Rio Grande do Sul in 2024. The notice did not assign a separate percentage contribution to each item. The overall average is the regulator’s proposed outcome, rather than a set of individually stated effects that can simply be added together.\n\nPublic participation has two channels. A hearing, Public Hearing 007/2026, is scheduled in Porto Alegre for October 8, starting at 2:30 p.m.; registration opens at 2 p.m. Consumers and other participants can speak at the in-person session. Written contributions to Consultation 027/2026 may be sent through October 9 on tariff review, tariff structure and technical losses. The hearing and the written consultation are separate ways to provide input within the same regulatory process.\n\nANEEL’s notice sets out the proposed average effects, the distributor’s customer count, the cost factors cited and the participation timetable. A final decision may reflect the regulator’s analysis by customer class as well as submissions received during consultation. The notice does not calculate the effect of a possible final increase on each household or business; that would depend on the customer’s voltage class, consumption profile and approved tariff. This account reports a proposal open for comment and keeps the draft rates distinct from prices currently in force.","corrections":[],"editorial_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"},"section_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"}}}
