{"version":"1","article":{"id":"alstom-hungary-matranovak-solar-power-plant","slug":"alstom-hungary-matranovak-solar-power-plant","language":"en","url":"https://haberpaper.com/en/news/alstom-hungary-matranovak-solar-power-plant","api_url":"https://haberpaper.com/api/v1/articles/alstom-hungary-matranovak-solar-power-plant?lang=en","title":"Solar park to supply more than one-fifth of Alstom’s Hungarian plant’s power","summary":"A 1 MW solar park commissioned at the Mátranovák site is expected to generate about 1,700 MWh a year and cover more than 20% of the plant’s electricity needs.","category":"energy","region":"world","topics":[],"published_at":"2026-10-22T05:34:34+03:00","modified_at":"2026-10-22T05:34:34+03:00","publication_basis":"publication-record","event_period":"2026-10-20","event_period_basis":"event-or-reference-period","sources":[{"name":"Alstom","url":"https://www.alstom.com/press-releases-news/2026/10/alstom-launches-solar-park-matranovak-site-reduce-industrial-carbon-footprint-hungary","publishedAt":"2026-10-20","checkedAt":"2026-10-22"}],"translations":[{"language":"tr","url":"https://haberpaper.com/tr/news/alstom-hungary-matranovak-solar-power-plant","api_url":"https://haberpaper.com/api/v1/articles/alstom-hungary-matranovak-solar-power-plant?lang=tr"},{"language":"en","url":"https://haberpaper.com/en/news/alstom-hungary-matranovak-solar-power-plant","api_url":"https://haberpaper.com/api/v1/articles/alstom-hungary-matranovak-solar-power-plant?lang=en"},{"language":"ar","url":"https://haberpaper.com/ar/news/alstom-hungary-matranovak-solar-power-plant","api_url":"https://haberpaper.com/api/v1/articles/alstom-hungary-matranovak-solar-power-plant?lang=ar"},{"language":"fr","url":"https://haberpaper.com/fr/news/alstom-hungary-matranovak-solar-power-plant","api_url":"https://haberpaper.com/api/v1/articles/alstom-hungary-matranovak-solar-power-plant?lang=fr"},{"language":"es","url":"https://haberpaper.com/es/news/alstom-hungary-matranovak-solar-power-plant","api_url":"https://haberpaper.com/api/v1/articles/alstom-hungary-matranovak-solar-power-plant?lang=es"}],"data_types":["metrics"],"data":{"version":1,"blocks":[{"id":"reported-indicators","type":"metrics","title":{"tr":"Alstom’un Macaristan’daki fabrikasının elektriğinin beşte birini güneş sağlayacak","en":"Solar park to supply more than one-fifth of Alstom’s Hungarian plant’s power","ar":"محطة شمسية لتوفير أكثر من خُمس كهرباء مصنع ألستوم في المجر","fr":"Le solaire doit fournir plus d’un cinquième de l’électricité du site hongrois d’Alstom","es":"La energía solar cubrirá más de una quinta parte de la electricidad de la planta húngara de Alstom"},"description":{"tr":"Mátranovák tesisinde devreye giren 1 MW güneş parkı yılda yaklaşık 1.700 MWh üretmek ve fabrikanın elektrik ihtiyacının yüzde 20’den fazlasını karşılamak üzere tasarlandı.","en":"A 1 MW solar park commissioned at the Mátranovák site is expected to generate about 1,700 MWh a year and cover more than 20% of the plant’s electricity needs.","ar":"من المتوقع أن تنتج محطة شمسية بقدرة ميغاواط واحد في موقع ماترانوڤاك نحو 1,700 ميغاواط ساعة سنوياً وتغطي أكثر من 20% من احتياجات المصنع الكهربائية.","fr":"La centrale solaire de 1 MW mise en service à Mátranovák devrait produire environ 1 700 MWh par an et couvrir plus de 20 % des besoins électriques du site.","es":"Se prevé que el parque solar de 1 MW puesto en marcha en Mátranovák genere unos 1.700 MWh al año y cubra más del 20% de la demanda eléctrica de la planta."},"methodology":{"tr":"Alstom tarafından devreye alındığı bildirilen tesisin kapasitesi; yıllık elektrik üretimi veya şebekeye kesintisiz sağlanan güç değildir. Tarih şirket duyurusudur. Gelecek üretim ve önlenen emisyon tahminleri bu gözlenen kapasite verisine karıştırılmamıştır.","en":"Capacity of the installation reported commissioned by Alstom, not annual generation or continuous grid output. Date is the company announcement. Future generation and avoided-emissions estimates are not mixed into this observed capacity datum."},"sourceUrls":["https://www.alstom.com/press-releases-news/2026/10/alstom-launches-solar-park-matranovak-site-reduce-industrial-carbon-footprint-hungary"],"updatedAt":"2026-10-22T05:14:40+03:00","items":[{"label":{"tr":"Devreye alınan güneş tesisinin kapasitesi","en":"Commissioned solar installation capacity"},"value":1,"unit":"MW","period":"2026-10-20","basis":"observed","measure":{"id":"commissioned-solar-installation-capacity","unitCode":"mw","geography":"hungary-matranovak-alstom-site","frequency":"irregular","aggregation":"stock","periodRole":"announcement-date"}}]}]},"data_compilations":[{"id":"reported-indicators","creator":{"@type":"Organization","@id":"https://haberpaper.com/#organization","name":"Haber Paper","url":"https://haberpaper.com/"},"license":{"@type":"CreativeWork","@id":"https://haberpaper.com/en/data-terms/v1#license","name":"Haber Paper Original Data Compilation License 1.0","url":"https://haberpaper.com/en/data-terms/v1"},"rights_scope":"Haber Paper original data arrangement, labels and methodology notes only; underlying source rights and permissions remain separate.","source_license_url":null}],"data_downloads":[{"id":"reported-indicators","formats":{"json":"https://haberpaper.com/api/v1/articles/alstom-hungary-matranovak-solar-power-plant/data/reported-indicators?lang=en&format=json","csv":"https://haberpaper.com/api/v1/articles/alstom-hungary-matranovak-solar-power-plant/data/reported-indicators?lang=en&format=csv"}}],"content":{"paragraphs":["Alstom said on 20 October 2026 that it had commissioned a 1 MW solar park at its Mátranovák factory in Hungary. The company expects the installation, covering about 7,000 square metres, to generate 1,700 MWh annually and supply more than 20% of the site’s electricity consumption. Generation began after nearly two years of planning, permitting and construction.","Alstom estimates that onsite generation will avoid about 260 tonnes of carbon dioxide emissions a year. The project was developed under a long-term onsite power purchase agreement between Alstom and E.ON. The Mátranovák plant makes bogie frames for metro and railway vehicles; the announcement did not disclose the project cost or electricity purchase price."],"key_points":[],"sections":[]},"text":"A 1 MW solar park commissioned at the Mátranovák site is expected to generate about 1,700 MWh a year and cover more than 20% of the plant’s electricity needs.\n\nAlstom said on 20 October 2026 that it had commissioned a 1 MW solar park at its Mátranovák factory in Hungary. The company expects the installation, covering about 7,000 square metres, to generate 1,700 MWh annually and supply more than 20% of the site’s electricity consumption. Generation began after nearly two years of planning, permitting and construction.\n\nAlstom estimates that onsite generation will avoid about 260 tonnes of carbon dioxide emissions a year. The project was developed under a long-term onsite power purchase agreement between Alstom and E.ON. The Mátranovák plant makes bogie frames for metro and railway vehicles; the announcement did not disclose the project cost or electricity purchase price.","corrections":[],"editorial_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"},"section_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"}}}
