{"version":"1","article":{"id":"afganistan-dahla-baraji-tasarim-dogrulama-2026","slug":"afghanistan-seeks-technical-review-of-dahla-dam-raising-design","language":"en","url":"https://haberpaper.com/en/news/afghanistan-seeks-technical-review-of-dahla-dam-raising-design","api_url":"https://haberpaper.com/api/v1/articles/afghanistan-seeks-technical-review-of-dahla-dam-raising-design?lang=en","title":"Afghanistan seeks technical review of Dahla Dam raising design","summary":"Consultancy scope includes spillways and saddle dams.","category":"energy","region":"world","topics":["epc-contractors"],"published_at":"2026-10-02T21:09:51+03:00","modified_at":"2026-10-02T21:09:51+03:00","publication_basis":"publication-record","event_period":"2026-09","event_period_basis":"event-or-reference-period","sources":[{"name":"Afghanistan Ministry of Energy and Water","url":"https://mew.gov.af/dr/request-expression-interest-4","checkedAt":"2026-10-02"}],"translations":[{"language":"tr","url":"https://haberpaper.com/tr/news/afghanistan-seeks-technical-review-of-dahla-dam-raising-design","api_url":"https://haberpaper.com/api/v1/articles/afghanistan-seeks-technical-review-of-dahla-dam-raising-design?lang=tr"},{"language":"en","url":"https://haberpaper.com/en/news/afghanistan-seeks-technical-review-of-dahla-dam-raising-design","api_url":"https://haberpaper.com/api/v1/articles/afghanistan-seeks-technical-review-of-dahla-dam-raising-design?lang=en"},{"language":"ar","url":"https://haberpaper.com/ar/news/afghanistan-seeks-technical-review-of-dahla-dam-raising-design","api_url":"https://haberpaper.com/api/v1/articles/afghanistan-seeks-technical-review-of-dahla-dam-raising-design?lang=ar"}],"data_types":[],"data":null,"data_compilations":[],"data_downloads":[],"content":{"paragraphs":["Afghanistan’s Energy and Water Ministry sought expressions of interest for review, verification and technical certification of Dahla Dam raising design, covering two spillway packages and six saddle dams.","The listed deadline for MOWE/1405/ICB/C-2755 was September 22, 2026, defining this report’s September reference period. This consultancy notice does not announce completed raising works or a selected contractor."],"key_points":[],"sections":[]},"text":"Consultancy scope includes spillways and saddle dams.\n\nAfghanistan’s Energy and Water Ministry sought expressions of interest for review, verification and technical certification of Dahla Dam raising design, covering two spillway packages and six saddle dams.\n\nThe listed deadline for MOWE/1405/ICB/C-2755 was September 22, 2026, defining this report’s September reference period. This consultancy notice does not announce completed raising works or a selected contractor.","corrections":[],"editorial_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"},"section_illustration":{"kind":"symbolic-editorial-illustration","documentary":false,"scope":"section","asset_id":"energy","url":"https://haberpaper.com/assets/illustrations/energy-1536.webp","width":1536,"height":1024,"alt":"Symbolic energy landscape with solar panels, wind turbines and transmission lines.","language":"en"}}}
